Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T19CM09372
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet T1; Index of Drawings: A note for the Development Package indicates a City of Tucson Activity Number of DP19-XXXX. Please complete the Activity Number. 2. Sheet A1; Detail 1: A note indicates the partition gypsum board fastener size and spacing shall conform to the IBC Table 2506.2. The fastener size and spacing must be shown on this detail for inspection purposes. Please provide that information. 3. Sheet A2; West Elevation 1: A note at the north end of this elevation indicates metal canopy references of Section 2/A3 and 3/A3. Section 2 does not indicate a metal canopy. Please verify. 4. Sheet A2; North Elevation 2: A note at the west end of this elevation indicates a downspout reference that is incomplete. Please revise. 5. Sheet A2; North Elevation 2: A note at the west end of this elevation indicates metal canopy references of Section 2/A3 and 3/A3. Section 2 does not indicate a metal canopy. Please verify. 6. Sheet A2; South Elevation 4: A note at the west end of this elevation indicates metal canopy references of Section 2/A3 and 3/A3. Section 2 does not indicate a metal canopy. Please verify. 7. Sheet A2; South Elevation 4: A note at the east end of this elevation indicates a downspout reference that is incomplete. Please revise. 8. Sheet A2; West Elevation 5: A note at the north end of this elevation indicates metal canopy references of Section 2/A3 and 3/A3. Section 2 does not indicate a metal canopy. Please verify. 9. Sheet A2; North Elevation 6: A note at the west end of this elevation indicates metal canopy references of Section 2/A3 and 3/A3. Section 2 does not indicate a metal canopy. Please verify. 10. Sheet A2; North Elevation 6: A note at the west end of this elevation indicates a downspout reference that is incomplete. Please revise. 11. Sheet A2; South Elevation 8: A note at the west end of this elevation indicates metal canopy references of Section 2/A3 and 3/A3. Section 2 does not indicate a metal canopy. Please verify. 12. Sheet A2; South Elevation 8: A note at the east end of this elevation indicates a downspout reference that is incomplete. Please revise. 13. Sheet A3; Detail 6: Please provide the sag rod spacing, or reference a detail/note for that information. 14. Sheet A4; Door Schedule: Please add a note to this schedule to reference Sheet SP1 for the door hardware specifications. 15. General: Please provide a Special Inspection Certificate with Parts A and B completed. This certificate may be found on the City of Tucson website at www.tucsonaz.gov/PDSD. 16. General: Four permits will be required with four separate addresses. Please contact Pima County Addressing. 17. General: Please provide written responses to all review comments. |
01/09/2020 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Four buildings require 4 permits |
01/14/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
01/15/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/16/2020 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T19CM09372 - New Buildings (Retail-General Merchandise / Food Services) Building Plan Review (1st Review) Flex Space at Sunset Ranch / Related to DP19-0166 2706 N Silverbell Road / C-1 Zoning TRANSMITTAL DATE: January 16, 2020 DUE DATE: January 23, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the un-approved version of the development package DP19-0166. While the building plans are consistent with the approved DP as it relates to the zoning review purview of the Building footprint, Height, square footage, site conditions etc., zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. 3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact David Rivera on Tuesday, Wednesday or Thursday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov |
01/23/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the energy code analysis for the building envelope, coordinating the building components used in the analysis with those shown on the drawing. Reference: Section C303.1, IECC 2018, as amended by the City of Tucson. 2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018. |
01/23/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide independent, secondary roof drainage. Reference: Section 1108.2, IPC 2018. |
01/29/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | Development package must be approved first. Ensure roof drainage is not directed over sidewalks. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/05/2020 | SBORZAK1 | REJECT SHELF | Completed |