Permit Number: T19CM08884
Parcel: 140580010

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T19CM08884
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/03/2020 MARTIN BROWN FIRE REVIEW Reqs Change The following are the comments from the first review, which were not addressed in the response letter.
Development Package for this project clearly indicates a fire sprinkler underground service going into the building. Architecturals show no sprinklers. As certain trade-offs were given for a sprinkler system (i.e., increased distance from hydrant, reduced fire flow for the building), one or the other of the plans must be revised. If no sprinklers are intended to be installed, an additional on site hydrant will be required. A revised master water plan may also be required. Please provide a response letter.
03/12/2020 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T19CM08884 - New Building (Retail - General Merchandise)
Building Plan Review (2nd Review) Dollar General / Related to DP19-0276
5450 E. Littletown Road - R-1 Zoning to C-1 Zoning (Per C9-19-04)

TRANSMITTAL DATE: March 12, 2020

DUE DATE: March 25, 2020

COMMENTS: Please resubmit the building plan drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Zoning has reviewed the building plans for compliance with the un-approved version of the development package. While the building plans are consistent with DP19-0276 as it relates to the zoning review purview of the Building footprint, Height, square footage, site conditions etc., and applicable conditions of rezoning, zoning cannot approve the building plans until the Development Package is approved and all PDSD Commercial Plans reviewers have approved the building plan.

2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with DP19-0276.

3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the approved DP19-0276, the building plans can be approved by zoning.


If you have any questions about this transmittal, Contact David Rivera on Tuesday, Wednesday or Thursday at (520) 837-4957 or by email at David.Rivera@tucsonaz.gov.
03/19/2020 RMCCOY1 BUILDING-COMMERCIAL REVIEW Approved
03/20/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
03/20/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide the civil plans showing the installation of the building sewer as part of the building plan set. Reference: Sections 104.2 and 107.2.1, IBC 2018. [Initial comment: Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2018.]
2. The Plumbing Fixture Schedule calls for the EWH-1 units to be installed under the lavatory sink but a boxed note on the plumbing plan calls for the units to be mounted on a shelf at 7'-6" AFF. [Initial comment: Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.]
03/20/2020 ROBERT SHERRY WATER REVIEW Reqs Change An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide the civil plans showing the installation of the water service to the building as part of the building plan set. Reference: Sections 104.2 and 107.2.1, IBC 2018. [Initial comment: Provide civil site plan showing the location and size of the water meter and backflow preventer for the water service to the building. Reference: Sections 107.2.1 and 107.2.6, IBC 2018.]
03/24/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
03/26/2020 LOREN MAKUS ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
04/16/2020 LBOWERS1 OUT TO CUSTOMER Completed
04/16/2020 LBOWERS1 REJECT SHELF Completed