Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T19CM08884
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/06/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2018. 2. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. |
| 01/06/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide civil site plan showing the location and size of the water meter and backflow preventer for the water service to the building. Reference: Sections 107.2.1 and 107.2.6, IBC 2018. |
| 01/09/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Section 6.4.2.1, ASHRAE 90.1-2016. 2. Verify the termination of the gutter downspouts. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or below grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson. 3. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). The exhausted air from the restrooms shall be limited to no more than 10% of any subsequent supply air stream. Reference: Section 403.2.1 (4), IMC 2018. |
| 01/09/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | T19CM08884 1) Approval of the development package is required prior to approval of the building plans 2) Ensure that roof drains, from the new building, scupper underneath sidewalks as needed. Reference COT Technical Standards Manual (TSM) section 7-01.4.1.e. Coordinate with the Development Package John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
| 12/18/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T19CM08884 - New Building (Retail - General Merchandise) Building Plan Review (1st Review) Dollar General / Related to DP19-0276 5450 E. Littletown Road - R-1 Zoning to C-1 Zoning (Per C9-19-04) TRANSMITTAL DATE: December 18, 2019 DUE DATE: January 3, 2020 COMMENTS: Please resubmit the building plan drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the un-approved version of the development package. While the building plans are consistent with the DP as it relates to the zoning review purview of the Building footprint, Height, square footage, site conditions etc., and applicable conditions of rezoning, zoning cannot approve the building plans until the Development Package is approved and all PDSD Commercial Plans reviewers have approved the building plan. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. 3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the approved DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact David Rivera on Tuesday, Wednesday or Thursday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov |
| 12/23/2019 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 12/23/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheets T01 through T04, A01 through A09, and AS01 through AS03: The registered architect must include the date the seal was signed. Please provide. 2. Sheet T02; Plumbing Fixture Requirements: Please include in this table the requirement of one Service Sink. 3. Sheets A01, A06, A09, AS01, and AS03: Please add a north arrow to these plans. 4. Sheet A01 (Floor Plan); Sheet A02 (Elevation 4): The grid line on the Floor Plan is different from the grid line on the Elevation. Please verify. 5. Sheet A01 (Floor Plan); Sheet A02 (Elevation 3): The grid line on the Floor Plan is different from the grid line on the Elevation. Please verify. 6. Sheet A07: Please provide structural calculations for the light pole foundations. 7. Sheet A08; Signs: Signs are required to be submitted under a separate permit. 8. Sheet S1; Foundation Design Information: The first sentence indicates the foundation design is based on assumed allowable soil bearing pressure of 2000 PSF per geotechnical report. Please remove the word "assumed". 9. General: Please provide structural calculations for the metal building foundation design. 10. General: If the metal building structural calculations, drawings, and specifications are going to be a deferred submittal, please add verbiage to the drawings that the requirements of the IBC Section 107.3.4.1 must be met. 11. General: Please provide a Special Inspection Certificate with Parts A and B completed for the next submittal. See the City of Tucson website www.tucsonaz.gov/PDSD. 12. General: Please provide written responses to all review comments. Review by Eric Newcomb Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov. |
| 12/27/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the folloeing electrical plan review comments. Also provide a written response.The comments inserted 12-27-19 were incorrect. The correct comment is as follows: Provide full compliance with ASHREA 90.1, 8.1.2, 8.4.2. As per the energy code chosen per plan sheet T04. |
| 12/30/2019 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Development Package for this project clearly indicates a fire sprinkler underground service going into the building. Architecturals show no sprinklers. As certain trade-offs were given for a sprinkler system (i.e., increased distance from hydrant, reduced fire flow for the building), one or the other of the plans must be revised. If no sprinklers are intended to be installed, an additional on site hydrant will be required. A revised master water plan may also be required. Please provide a response letter. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/02/2020 | AMARTIN1 | REJECT SHELF | Completed |