Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T19CM08810
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/02/2020 | ELISA HAMBLIN | ZONING | REVIEW | Approved | |
| 10/02/2020 | EHAMBLI1 | ENGINEERING | REVIEW | Passed | |
| 10/02/2020 | EHAMBLI1 | NPPO | REVIEW | Passed | |
| 10/19/2020 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T19CM08810 PLAN REVIEW COMMENTS The plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL REQUIREMENTS: The City of Tucson adopted the 2018 IRC with amendments on 1/1/2019. Show the current code reference on the plans. All engineers and architects involved in the design of the structure are to seal the related sheets of plans, details and calculations in accordance with the rules of the State Board of Technical Registration SITE PLAN: 1. Update the location of the electric meter base, R106.1.1. Provide a panelboard clear working space of 30”wide x 36”deep, E3405.2. The clearance is the minimum space from the face of the panel to the building wall. STRUCTURAL PLANS: 1. Provide structure design for cold-formed steel building with an Arizona engineer’s calculation, design and seal, R106. Include the foundation fastening requirements. ELECTRICAL PLANS: 1. TEP usually requires the service panel on the property at the closest building to the service transformer. The overhead service conductor over the proposed building requires an 8’ clearance above the roof, E3604.2.1. The necessary mast height at the existing panel location is not a feasible installation, therefore relocate the panel or show an underground service conductor. If you have any questions, please contact: Ken Van Karsen (520) 791-5550 City of Tucson Residential Plan Review |