Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM08567
Parcel: 14118605B

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T19CM08567
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/04/2020 RMCCOY1 BUILDING-COMMERCIAL REVIEW Reqs Change 1. Please provide structural calculations for the foundation design for the light pole. This is item #12 of the plan review comments from the first review. The structural calculations do not contain the light pole design.
02/04/2020 RMCCOY1 ELECTRICAL-COMMERCIAL REVIEW Reqs Change 1. The Interior Lighting Compliance Certificate provided is referencing the 1012 IECC. Please recalculate in accordance with the 2018 IECC which the City of Tucson has adopted.
02/05/2020 RMCCOY1 MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Plan review comment item #3: Provide calculations for the building envelope (e.g. COMcheck) to demonstrate compliance with the energy code; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. As a minimum, the information shall include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2018.
Review comment: The COMcheck Envelope Compliance Certificate that was submitted in response to this comment item is citing the 2012 IECC; the City of Tucson has adopted the 2018 International Codes including the 2018 IECC. Please submit the envelope compliance report based off of the 2018 INTERNATIONAL ENERGY CONSERVATION CODE. Also, the Project Type under Project Information should be listed as New Construction, not Alteration.
2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018.
Review comment: Please coordinate the heating and cooling loads with the construction drawings. The roof shows R-30 insulation in the attic space which is different from the type shown in the HVAC load calculations. The construction of the walls is of wood frame construction, not metal framed as shown in the load calculations.
3. The Mechanical Compliance Certificate is citing the 2012 International Energy Code, not the 2018 IECC.
Please address all comments in writing.
02/05/2020 RMCCOY1 PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Plumbing review comment #5. Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. Reference: Section 1003.9, IPC 2018.
Review response: Please specify venting of the grease separator containment tank and the outlet trap to allow for the escape or admittance of air to compensate for the variable fluid level in the tank. IPC 1003.9.
2. Plumbing review comment #6. Show how stormwater will be directed to the roof drains to avoid excessive localized ponding. No crickets are shown on the architectural roof plan (A5.1). Reference: Section 1101.7, IPC 2018.
Review response: Section 306.5 of the INTERNATIONAL MECHANICAL CODE requires that the access to ladder for roof mounted equipment to be provided at all times. In a storm event the access to the roof mounted equipment could be impeded if drainage water is directed to the access ladder location. IPC section 1106.5 specifies the use of parapet wall scuppers for storm water roof drainage systems. Specify crickets for directing storm water to roof drains and suppers and provode drainage calculations. IPC 1106.6
02/12/2020 IMONSHI1 ZONING REVIEW Reqs Change FROM: Iman Monshizadeh
PDSD Zoning Review Section

PROJECT: T19CM08567 - Tropical smoothie Cafe
Building Plan Review (2nd Review) / Relate to [DP19-0260]
10230 E Old Vail / C-1 Zoning

TRANSMITTAL DATE: February 12th, 2020

DUE DATE: February 25th, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Zoning has reviewed the building plans for compliance with the approved development package. While the building plans are consistent with the approved DP as it relates to the zoning review purview of the Building footprint, Height, square footage, site conditions etc., zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans.

2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP.

3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning.


If you have any questions about this transmittal, Contact Iman Monshizadeh at (520) 837-4082 or by email Iman.Monshizadeh@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov
03/02/2020 JOHN VAN WINKLE ENGINEERING REVIEW Approved
03/02/2020 ROBERT SHERRY WATER REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
04/15/2020 LBOWERS1 OUT TO CUSTOMER Completed
04/15/2020 LBOWERS1 REJECT SHELF Completed