Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM08273
Parcel: 12801005H

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T19CM08273
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/02/2020 RMCCOY1 ELECTRICAL-COMMERCIAL REVIEW Approved
01/02/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Clarify the piping arrangement for the hot water to lavatory LAV-7. If you intended to have the recirculation loop run by LAV-7 and then continue, connect the two hot water pipes and don't reduce the loop to ½", just run a ½" branch from the loop to the lavatory. Note that the requirement for the loop to be within 2-feet of LAV-7 does not apply to the LAV-1 lavatories - see Table C404.5.1, IECC 2018. [Initial comment: Verify that the distance from the hot water source to the hot water termination for the public lavatory (L7), complies with the requirements of Section C404.5, IECC 2018.]