Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM08097
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/12/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet S2.6 - Canopy Plan View - Canopy C - states W14x34 Steel Beam and W14x48 Steel Column . The Structural Calculations page 5.16 states W12x45 Beam and W12x50 Column . Please clarify and amend plans . IBC 107.2.1. 2. Sheet S2.8 - Canopy Plan View - Canopies D to I - states W14x30 Steel Beam , the Structural Calculations page 6.16 states W12x35 Beam . Please clarify and amend plans . IBC 107.2.1. 3. Sheet S3.0 - Canopy Plan View - Canopy J - states W14x30 Steel Beam and W14x48 Steel Column . The Structural Calculations page 7.15 states W12x35 Beam and W12x50 Column . Please clarify and amend plans . IBC 107.2.1. Respond to Plan Review comments in writting . |
11/14/2019 | JPEELDA1 | FIRE | REVIEW | Approved | |
11/19/2019 | IMONSHI1 | ZONING | REVIEW | Reqs Change | FROM: Iman Monshizadeh PDSD Zoning Review Section PROJECT: T19CM08097 - New Solar Canopies Building Plan Review (1st Review) Sun Tran Solar Canopies/ Relate to DP19-0242 3960 N Sun Tran Bl. / I-1 Zoning TRANSMITTAL DATE: November 19th, 2019 DUE DATE: December 4th, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Ensure details on the building plan are consistent with the Development package on the next submittal 2. COMMENT: The parking shown on the far west of the property (sheet C3.0) and the far east (sheet C4.0) is not shown on the DP. Ensure both plans show correct and consistent parking spaces for the entire site on the next submittal. 3. COMMENT: Canopy B elevation shown on sheet S2.5 (9'-6") is not consistent with the elevation shown on the DP (8'-2") provide correct and consistent elevations for Canopy elevations on the next submittal. 4. COMMENT: total square footage table shown on the cover sheet is inconsistent with the one shown on the DP. Ensure the next submittal shows consistent square feet for the building plans and the DP 5. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. 6. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact Iman Monshizadeh at (520) 837-4082 or by email Iman.Monshizadeh@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov |
12/03/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/09/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | T19CM08097 1) The site plan does not match what is shown in the approved development package. Please update as needed to ensure consistency between what is shown in the building plans and what is shown in the development package. double check the spacing between carports, parking lot layout and canopy elevations |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/10/2019 | AMARTIN1 | OUT TO CUSTOMER | Completed |