Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM08056
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/07/2019 | PAUL CAMARENA | ZONING | REVIEW | Approved | |
11/07/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/13/2019 | KROBLES1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/21/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
11/21/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/03/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Passed | |
12/11/2019 | KROBLES1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.1; Interior Wall Type Legend: At Wall Types 1, 2, 3, 4, and 5, please reference Sheet T2.1 for the gauge of the metal studs. 2. Sheet A1.1; General Notes: Note 8 references a shelf above the mop sink to support the water heater. Please provide a detail of the shelf construction on this sheet. 3. Sheet A4.1; Detail 1: Please indicate the number and size of the connectors for the diagonal bracing to the roof structure above and to the top of the partition wall. 4. General: Please provide a Special Inspection Certificate with Parts A and B completed. This form is located on the City of Tucson website at www.tucsonaz.gov/PDSD. 5. General: Please provide written responses to all review comments. |
12/11/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3, IMC 2018. |
12/11/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported from the building structure. Reference: Section 301.2, IPC 2018. 2. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. (Note that manufacturer's specification sheet for the proposed faucet states that it is "Not approved for commercial use".) Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. |