Permit Number: T19CM07968
Parcel: 137055460

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T19CM07968
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/02/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Update the waste and vent isometric to show the direct connection for the underbar hand sink, B10. [Initial comment: Provide a direct waste connection for the bar and hand sinks. Reference: Sections 301.3 and 802.1, IPC 2018.]
01/02/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Nothing has been received from the landlord regarding the addition of heat pumps to suite 180. Evaluating the energy compliance of the addition and providing construction documents that will bring the suite into compliance with the current energy code will be required prior to issuing a construction permit for a tenant improvement. The IECC defines an increase in the conditioned floor area of a building as an addition. As such, the addition must comply with the requirements of the current code. The addition alone or the addition plus the existing building may be evaluated for compliance. [Initial comment: Suite 110 of the shell was provided with heat pumps but Suite 180 only received roof curbs for future heat pumps. Alterations of an existing, non-conditioned building shall be brought into full compliance with the 2018 International Energy Conservation Code. Provide calculations for the building envelope to demonstrate compliance with the energy code as new construction. Reference: Section C503.2, IECC 2018.]
2. See comment #1. [Initial comment: Revise the COMcheck mechanical compliance certificate to reflect the installation of all six heat pumps.]
3. [Initial comment: Show how one of the "Additional Efficiency Package Options" (C406, IECC 2018) is to be accomplished. Reference: Section C401.2, IECC 2018.]
4. See comment #1. Deferred submittal items are to be identified and listed by the architect on the construction documents and require prior approval by the building official. [Initial comment: Show that the walk-in cooler (K13) and the walk-in freezer (K17) comply with the construction and energy efficiency requirements of Section C403.10.2, IECC 2018.]
01/06/2020 MARTIN BROWN FIRE REVIEW Approved