Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM07968
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/05/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
11/07/2019 | PAUL CAMARENA | ZONING | REVIEW | Approved | |
11/12/2019 | MROSS2 | FIRE | REVIEW | Reqs Change | Please clearly indicate all exit doors except main entrance will have panic heardware. (2018 IFC, section 1010.1.10) Main entrance shall have a sign in accordance with section 1010.1.9.4(2.2). Indicate any hardware (or none) on patio gate. |
11/19/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. 2. Provide a metering faucet for the restroom lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. Provide separate indirect waste pipes for each compartment of the 3-compartment sinks to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.1, IPC 2018. 4. Provide a direct waste connection for the bar and hand sinks. Reference: Sections 301.3 and 802.1, IPC 2018. |
11/20/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
11/21/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Evaporative cooling systems that do not include water recycling or reuse systems (e.g. MAU-1) are prohibited by the Arizona Revised Statues, ARS 45-313. 2. Suite 110 of the shell was provided with heat pumps but Suite 180 only received roof curbs for future heat pumps. Alterations of an existing, non-conditioned building shall be brought into full compliance with the 2018 International Energy Conservation Code. Provide calculations for the building envelope to demonstrate compliance with the energy code as new construction. Reference: Section C503.2, IECC 2018. 3. Revise the COMcheck mechanical compliance certificate to reflect the installation of all six heat pumps. 4. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2018) is to be accomplished. Reference: Section C401.2, IECC 2018. 5. Show that the walk-in cooler (K13) and the walk-in freezer (K17) comply with the construction and energy efficiency requirements of Section C403.10.2, IECC 2018. 6. Show the size, routing, and termination of the condensate drains from the heat pumps and the drain from the make-up air unit. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. 7. Revise the note in detail 1/A301 to indicate that the field-applied grease duct enclosure must continuously enclose all sides of the grease duct from the duct origin to the duct termination. Reference: Section 506.3.11.2, IMC 2018. 8. Provide structural calculations and details to show that the Type I hood and the Type II hood are supported from the building structure in accordance with Sections 507.2.4 and 507.3.2, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2018. 9. The Type I hood penetrates the hung ceiling in the kitchen. Show how the hood installation will comply with Section 507.2.7, IMC 2018. |
11/22/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/03/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved |