Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM07841
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/17/2020 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/19/2020 | RMCCOY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 03/19/2020 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a completed Special Inspections Form for required Epoxy and Expansion anchors noted in Structural Notes on sheet S1. IBC107.2.1. 2. Structural Calculations specifies a Simpson STHD 10 holdown at shearwall , but the shearwall and holdown(s) are not illustrated on plan .Please indicate the shear wall on plan and location of holdown(s) . IBC107.2.1. |
| 03/27/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Based on the existing plumbing fixtures visible in the drawings and the new plumbing fixtures, the estimated water demand will be 27.6 GPM. The existing 5/8" water meter is only capable of passing 20 GPM. 2. The water pressure for this address has a range of 77-84 PSI. Provide a water pressure regulator conforming to ASSE 1003 or CSA B356 to limit the water pressure to 80 PSI or less. Reference: Section 604.8, IPC 2018. |
| 03/27/2020 | STEVE SHIELDS | ZONING | REVIEW | Passed | |
| 03/27/2020 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 03/31/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the intension for the water heater. On the mechanical/plumbing plan, the existing water heater is to remain but in the plumbing notes, a new 50-gallon water heater is to be installed. 2. The minimum air gap for the termination of a temperature and pressure relief valve is two pipe diameters (1-1/2" in this case). Reference: Section 504.6 (10), IPC 2018. |
| 03/31/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, and C502.1, International Energy Conservation Code 2018 |
| 04/08/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |