Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T19CM07817
Parcel: 12909016B

Address:
1501 S CHERRY AV

Review Status: Active

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T19CM07817
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
11/04/2019 PAUL CAMARENA ZONING REVIEW Reqs Change FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: NEW 2256 SQFT CANOPY
Building plans (1st Review) 1501 S CHERRY AV
T19CM07817 - C-3 Zoning

TRANSMITTAL DATE: November 4, 2019


COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Zoning has reviewed the plan and cannot approve at this time. Please address the following comments.


2. COMMENT: A Development package will be required for any expansion of a commercial building .





If you have any questions about this transmittal, Contact Paul Camarena any time during the week at (520) 837-4082 or by email Paul.Camarena@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans
11/06/2019 MARTIN BROWN FIRE REVIEW Approved
11/19/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet AST1; Site Plan: The new canopy is listed as 1740 SF on this plan, while the Permit Application indicates 2256 SF. Please coordinate.
2. Sheet S-1; Foundation and Framing Plan: The dimensions indicate a maximum 25'-0" canopy width, and a 60'-6" length.This produces a maximum 1513 SF. Please verify the actual canopy SF, and indicate that canopy on this plan.
3. Sheet S-1; General Structural Notes (Code): The 2012 International Building Code (IBC) is indicated. Please revise that to the 2018 IBC, and revise the structural calculations as required.
4. Sheet S-1; General Structural Notes (Foundations): The lateral soil pressure design references the IBC Table 18-1-A. Please revise that table reference to the appropriate table in the 2018 IBC.
5. Structural Calculations; Cover Page: The Address indicates the 2012 IBC. The City of Tucson has adopted the 2018 IBC. Please revise and verify the structural calculations using the 2018 IBC.
6. Structural Calculations; Cover Page: A note indicates "THESE STRUCTURAL CALCULATIONS MUST BE SUBMITTED WITH WET SEAL DATED NOT OVER 180 DAYS PRIOR TO PERMIT APPLICATIONS". Please revise all seal dates (drawings and calculations) to meet that criteria.
7. Structural Calculations; Sheet 24: Using the column base plate option (Detail 7/S-1), no anchor bolt design was included in the calculations. Please provide.
8. Structural Calculations: Using the standard caisson footing option (Details 1/S-1 and 1A/S-1), no caisson design was included in the calculations. Please provide.
9. General: Please provide written responses to all review comments.

Review by Eric Newcomb
Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov
11/22/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change A development package is required.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/23/2019 ANY REJECT SHELF RECEIVED