Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T19CM07773
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/22/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The extent of the design to be deferred shall be shown on the construction documents and approved by the building official prior to completion of the current review. Reference: Section 107.3.4.1, IBC 2018. [Second comment: Show how the grease exhaust is going to be revised to meet the code requirements (i.e. not just notes). The current exhaust fan appears to be located partly under the roof on the west side of the truck, definitely not 40" above the roof of the truck and the fan also appears to be a down blast fan.] [Initial comment: Verify that the installation of the grease exhaust fan complies with Sections 506.3.13.1, 506.3.13.3, 506.5.3, 506.5.4 and 506.5.6, IMC 2018.] |
| 10/01/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: T19CM07773 - Babylon Market Building Plan Review (2nd Review) / Relate to DP18-0207 3954 E Speedway / C-2 Zoning TRANSMITTAL DATE: October 1, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with DP18-0207, once it has been approved. 2. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 10/07/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Per previous comments, provide the structural calculations for the steel awning. Your responses indicate those calculations are included in the submittal set, but they are not there. |
| 10/20/2020 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | Approval of the Development Package (DP18-0207) is required prior to approval of the building plans. Once the DP is approved the building plans will be reviewed Stephen Blood stephen.blood@tucsonaz.gov |