Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T19CM07773
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/22/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 05/22/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Show how the grease exhaust is going to be revised to meet the code requirements (i.e. not just notes). The current exhaust fan appears to be located partly under the roof on the west side of the truck, definitely not 40" above the roof of the truck and the fan also appears to be a down blast fan. [Initial comment: Verify that the installation of the grease exhaust fan complies with Sections 506.3.13.1, 506.3.13.3, 506.5.3, 506.5.4 and 506.5.6, IMC 2018.] |
| 05/26/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | 1) Approval of both the development package (DP18-0207) and Board of Adjustment process (T19SA00034 which is in expired status) is required prior to approval of the building plans. Once those items are approved the building plans will be reviewed |
| 05/26/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Previous Comment 5; Sheet S1.0: Please provide structural calculations for the new steel awning as required. Those calculations were not included in this submittal as requested. |
| 05/26/2020 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 06/09/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: T19CM07773 - Babylon Market Building Plan Review (2nd Review) / Relate to DP18-0207 3954 E Speedway / C-2 Zoning TRANSMITTAL DATE: June 9, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with DP18-0207, once it has been approved. 2. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. 3. COMMENT: Ensure that the conditions included with the approved IPP, Board of Adjustment, and DDO are included as notes on the plan. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |