Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM07753
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/31/2019 | SBORZAK1 | ZONING | REVIEW | Needs Review | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: Speedway Training Center - 15 W. Grant Road T19CM07753 Building Plan (1st Review) TRANSMITTAL DATE: October 28, 2019 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. It appears that there have been changes to the site that are not reflected on the last approved site plan, i.e. additional vehicle parking added along the front of the main building, one (1) being an additional accessible vehicle parking space that does not meet the requirements of ICC A117.1-2009 Section 501, no access aisle is provided. A new development package will need to be submitted and approved prior to approval of this building plan. 3. Until the building plan is approved by all other review agencies Zoning cannot approve the plan. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
11/06/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/26/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide plans sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. The training room is an A3 assembly occupancy. Revise the plumbing fixture calculation including the correct occupancy types. 3. Appliances (e.g. beverage dispensers, ice makers, etc.) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Section 608.14.1, IPC 2018 require backflow prevention. Specify the type of backflow prevention device required for each water connection. At a minimum, coffee machines and non-carbonated beverage dispensers require the use of a backflow preventer listed to either ASSE 1022, ASSE 1024, or an air gap. Reference: Sections 608.1, 608.3 and 608.17.1.2, IPC 2018. |
11/26/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide plans sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces as part of this change of use. Reference: Section 403.3, IMC 2018. 3. Provide general room exhaust for any cooking appliance (e.g. hot dog roller grill, convection oven, etc.) that does not require the installation of a Type II hood. The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual appliance. Reference: Section 507.1, exception 2 and 507.3, IMC 2018. |
11/26/2019 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Provide the Code Analysis for the minimum number of required plumbing fixtures . IBC Chap. 29 , (P) Table 2902.1. |
11/27/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments. Also provide a written response. #1. Provide electrical plans sealed by an electrical registrant registered in the State of Arizona. #2. Provide a complete electrical line diagram and load calcs for panel 'MDP'. #3. Provide a complete electrical lighting plan. Ref; City of Tucson Commercial Plan Submittal Requirements. www.tucsonaz.gov/pdsd |
12/09/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | T19CM07753 1) A development package submittal is required. Refer to coning comments 2) Once the development package and any outstanding commercial reviews have been completed Engineering can approve the building plans |