Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM07701
Parcel: 12405007B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T19CM07701
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/21/2019 SARAH MEGGISON ZONING REVIEW Approved
10/21/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Specify the exhaust fan for the new restroom. Reference: Section 107.2.1, IBC 2018.
2. Provide information on the sequence of operation for the restroom exhaust fan to show that all of the air supplied to the restroom will be exhausted. Reference: Section 403.2.1 (4), IMC 2018.
10/21/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
2. Provide tempered water for the lavatory using an approved device conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018.
10/21/2019 SMEGGIS1 ENGINEERING REVIEW Passed
10/21/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet T1; Exit Plan: Per the IBC Section 1017.3, please indicate the exit access travel distance from the most remote point of each room to the exit. Please indicate that travel distance on the plan.
2. Sheet A2; Toilet Mounting Heights: Please indicate the dimension to the vertical grab bar from the finish floor per the ICC/ANSI Figure 604.5.1.
3. Sheet A2; Floor Plan: Please verify the Suite Number is correct as shown.
4. General: Please provide written responses to all review comments.
10/21/2019 ROBERT SHERRY WATER REVIEW Completed
10/21/2019 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/22/2019 MARTIN BROWN FIRE REVIEW Approved
10/31/2019 KROBLES1 ELECTRICAL-COMMERCIAL REVIEW Needs Review