Permit Number: T19CM07377
Parcel: 107020090

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T19CM07377
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/26/2020 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: 3224 N Freeway Industrial loop NEW SHELL BUILDING
Building plans (2nd Review) 3224 N FREEWAY INDUSTRIAL LP
T19CM07373 / T19CM07377- I-1 Zoning - Related to DP19-0246

TRANSMITTAL DATE: February 26, 2020
Due Date March 5, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


01. COMMENT: Zoning has done a review of the building plans for the T.I., while the building are consistent as it relates to the zoning review purview zoning cannot approve the building plans until the Commercial Plans reviewer(s) have approved the building plans and the DP 19-0246 is approved. (As of this review the DP has yet to be approved.)

02. COMMENT: Zoning will review the building plans on the next submittal to assure consistency with the approved DP. (Once the DP is approved by all reviewers and the building plans are approved by the Commercial Plans reviewers zoning can approve the building plans.)

03. COMMENT: Assure that the site plan in the building plans package matches the site plan from the DP package.

If you have any questions about this transmittal, Contact David Rivera at (520) 837-4957 or by email David.Rivera@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans
03/02/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G0.1; Life Safety Plan: Per the IBC Section 1017.3, exit access travel distance shall be measured along the unobstructed path of horizontal and vertical egress travel. Please remove the diagonal paths to meet that requirement.
2. Sheet G0.1; Code Review (Egress): All three suites are indicated as Suite 1. Please revise.
3. Sheet G0.1; Code Review (Egress): The occupant load references Table 1004.1.2. Please revise that reference to the 2018 IBC.
4. Sheet G0.1; Code Review (Codes): Please revise the 2010 ADAAG to the 2009 ICC/ANSI Accessibility Code.
5. Sheet A5.1; Enlarged Floor Plan 6: The ambulatory accessible water closet must meet the space requirements of the ICC/ANSI Section 604.10.2 (36" width x 60" depth). Please indicate that on this plan.
6. Sheet A5.1; Enlarged Floor Plan 6: Please add grab bars, seat, compartment size, etc. for the shower as required per the ICC/ANSI Section 608.
7. Sheet A5.1; Elevation 13: Please provide a counter height dimension on this elevation, or reference the location of that information.
8. Sheets S1.0, S2.0, and S3.0: White-out is not allowed on sealed drawings. Please resubmit new drawings.
9. General: Are there special inspections to be added to this permit? If so, provide a Special Inspection Certificate as required.
10. General: Please provide written responses to all review comments.
03/04/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
03/05/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan recommends. Also provide a written response.
1. As requested per the previous electrical plan review comment. The reviewer could not locate a written response in this resubmittal.
2. Please address comment # 2.
Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements, 2012 Tucson/Pima County Outdoor Lighting Code.
03/05/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The wall insulation described in the COMcheck form does not agree with the general note on sheet A5.1. [Initial comment: Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope (e.g. building and wall sections, building elevations, etc.). The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018.]
2. Heating and cooling load calculations have not been submitted. [Initial comment: Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018.]
03/13/2020 PCAMARE1 ENGINEERING REVIEW Reqs Change DP must be approved first.