Permit Number: T19CM07377
Parcel: 107020090

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T19CM07377
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/23/2019 MARTIN BROWN FIRE REVIEW Approved
10/30/2019 PAUL CAMARENA ZONING REVIEW Reqs Change FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: 3224 N Freeway Industrial loop TI
Building plans (1st Review) 3224 N FREEWAY INDUSTRIAL LP
T19CM07377 - I-1 Zoning - Related to DP19-0246

TRANSMITTAL DATE: October 30, 2019


COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


01. COMMENT: COMMENT: Zoning has done a review of the building plans. In addition, while the building are consistent as it relates to the zoning review purview zoning cannot approve the building plans until the Commercial Plans reviewer(s) have approved the building plans.

02. COMMENT: Zoning will review the building plans on the next submittal to assure consistency with the DP. Once the DP is approved by all reviewers and the building plans are approved by the Commercial Plans reviewers zoning can approve the building plans



If you have any questions about this transmittal, Contact Paul Camarena any time during the week at (520) 837-4082 or by email Paul.Camarena@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans
10/31/2019 RMCCOY1 ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Provide a note schedule or legend that correlates with the numbers in the rectangles for all the electrical plans.
2. Provide complete compliance with the 2018 IECC for lighting.
Ref; 2018 IBC sec 107.2.1, 2017 NEC. City of Tucson Commercial Plan Submittal requirements. 2012 Tucson/Pima County Outdoor Lighting Code
10/31/2019 RMCCOY1 BUILDING-COMMERCIAL REVIEW Reqs Change 1. Provide Structural Calculations for the proposed foundation , the walls , and ceiling framing . IBC 107.2.1.
2. Provide Exterior and Interior Elevations . IBC 107.2.1.
3. Clarify the intended use above the framed ceiling , and clarify if access will be provided .IBC 107.2.1.
4. Provide the correct exit travel distance as described in IBC 1017.3 and amend plans . IBC 1017.3.
5. Provide Section drawings . IBC 107.2.1.
Respond to plan review comments in writting .
10/31/2019 RMCCOY1 PLUMBING-COMMERCIAL REVIEW Reqs Change 1. If the shower does not have a pre-fabricated receptor, provide details to show that the construction of the receptor complies with the requirements of Section 421.5, IPC 2018.
2. Verify that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018.
3. Coordinate the waste and vent diagram with the plumbing floor plan; a 4" GCO is shown on the diagram but not on the plumbing plan). Reference: Section 107.2.1, IBC 2018.
11/07/2019 RMCCOY1 MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope (e.g. building and wall sections, building elevations, etc.). The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration.. Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018.
2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018.
3. Show that the proposed HVAC equipment meets the minimum performance requirements of Section C403.3.2, IECC 2018.
4. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2018) is to be accomplished. Reference: Section C401.2, IECC 2018.
5. Fan coil FC-2 is located "OH IN MEZZANINE." How is it supported? Reference: Section 304.1, IMC 2018.
6. Include the area of the mezzanine storage in the ventilation calculations. Reference: Section 403.3.1.1, IMC 2018.
11/07/2019 RMCCOY1 WATER REVIEW Completed
11/12/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change DP must be approved first.