Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T19CM07373
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/23/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/30/2019 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: 3224 N Freeway Industrial loop NEW SHELL BUILDING Building plans (1st Review) 3224 N FREEWAY INDUSTRIAL LP T19CM07373 - I-1 Zoning - Related to DP19-0246 TRANSMITTAL DATE: October 30, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: COMMENT: Zoning has done a review of the building plans. In addition, while the building are consistent as it relates to the zoning review purview zoning cannot approve the building plans until the Commercial Plans reviewer(s) have approved the building plans. 02. COMMENT: Zoning will review the building plans on the next submittal to assure consistency with the DP. Once the DP is approved by all reviewers and the building plans are approved by the Commercial Plans reviewers zoning can approve the building plans If you have any questions about this transmittal, Contact Paul Camarena any time during the week at (520) 837-4082 or by email Paul.Camarena@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
| 10/31/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide Structural Calculations for the proposed foundation . IBC 107.2.1. 2. Provide Structural Calculations for the proposed metal building . IBC 107.2.1. 3. Provide Exterior Elevations . IBC 107.2.1. 4. Provide the correct exit travel distances as described in IBC 1017.3 and amend plans . IBC 1017.3. Respond to plan review comments in writting . |
| 11/07/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 11/07/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 11/07/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 11/12/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide a note schedule or legend that correlates with the numbers in the rectangles for all the electrical plans. 2. Provide a note whether or not a special inspection is required for outdoor lighting per section; 104.2.2 and 106.2. 3. Provide complete compliance with the 2018 fot the lighting. 4. Is the electrical service installed under the Shell permit or the TI permit? Ref; 2018 IBC sec 107.2.1, 2017 NEC. City of Tucson Commercial Plan Submittal requirements. 2012 Tucson/Pima County Outdoor Lighting Code |
| 11/12/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | DP must be approved first. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/07/2020 | PMARTIN1 | OUT TO CUSTOMER | Completed |