Permit Number: T19CM07153
Parcel: 11205030B

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T19CM07153
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/07/2019 MARTIN BROWN FIRE REVIEW Reqs Change
10/09/2019 PAUL CAMARENA ZONING REVIEW Approved
10/16/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Plan Set submitted with Sheets PV-3 and PV-4 stamped - NOT FOR CONSTRUCTION - clarify and submit correct plan sheets . IBC 107.2.1.
Please respond to comments in writting .
10/24/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Ref Line diagrams:
(a) Indicate the conduit, conductor sizes and types for the existing feeders between the splice boxes and the distribution panels and the service panels. Also show the distance.
(b) Service #1. The added current from the PV source to the existing feeders feeding the service panel combined with the utility source current, now has a potential of supplying 125(utility) + 41.7(PV) = 166.7 total amps to the existing feeders. Provide overcurrent protection for the existing feeder downstream of the spice box or justify how these feeders are protected from overcurrent. NEC 215.3, 240.4, 240.21, 705.12, (over current protection for conductors).
(c) Service #2. Same scenario, different ampacity applied to existing feeders. 150(utility) + 41.7(PV) = 191.7 total amps.
2. Provide a grounding detail for the racking and PV moodules.

Ref; 2018 IBC sec 107.2.1, 2017 NEC. City of Tucson Commercial Plan Submittal requirements.
11/01/2019 LOREN MAKUS ENGINEERING REVIEW Passed Out as shown.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/06/2019 PMARTIN1 OUT TO CUSTOMER Completed