Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM07151
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/07/2019 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Please provide pathways as required per section 1204.3.1 of the 2018 International Fire Code. Show dimensions. |
| 10/09/2019 | PAUL CAMARENA | ZONING | REVIEW | Approved | |
| 10/10/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Plan Set submitted with Sheets PV-3 and PV-4 stamped - NOT FOR CONSTRUCTION - clarify and submit correct plan sheets . IBC 107.2.1. Please respond to comments in writting . |
| 10/24/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Ref Line diagrams: (a) Indicate the conduit, conductor sizes and types for the existing feeders between the splice boxes and the distribution panels and the service panels. Also show the distance. (b) Service #1. The added current from the PV source to the existing feeders feeding the service panel combined with the utility source current, now has a potential of supplying 125(utility) + 41.7(PV) = 166.7 total amps to the existing feeders. Provide overcurrent protection for the existing feeder downstream of the spice box or justify how these feeders are protected from overcurrent. NEC 215.3, 240.4, 240.21, 705.12, (over current protection for conductors). (c) Service #2. Same scenario, different ampacity applied to existing feeders. 150(utility) + 41.7(PV) = 191.7 total amps. 2. Provide a grounding detail for the racking and PV moodules. Ref; 2018 IBC sec 107.2.1, 2017 NEC. City of Tucson Commercial Plan Submittal requirements. |
| 11/01/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | Per LOMA 13-09-2349A building is removed from FP. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/06/2019 | PMARTIN1 | OUT TO CUSTOMER | Completed |