Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T19CM07097
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/09/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 09/11/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The toilet accessories schedule on sheet A5.2 shows the basic faucet information for lavatories P-1 and P-1A but does not show that the faucets comply with the requirements of Section 419.6, IPC 2018 as amended by the City of Tucson. Specifically, what is the water flow rate, the maximum amount of water delivered per cycle, and the minimum time for water delivery for accessibility (see Section 606.4, ICC/ANSI A117.1-09). Provide third-party certification that the lavatory P-1 (identified as LAV-1 on sheet a5.2 and the concrete trough lavatory (identified variously as LAV-1, LAV-3 and P-1A) comply with the requirements of Sections 402.1, 402.2, and 419.1, IPC 2018. Reference: Section 303.4, IPC 2018. [Third comment: Comment not addressed.] [Second comment: Comment not resolved. Provide the specifications for the lavatories (P-1 and P1A). Include the lavatory and faucet specifications on the drawings. Provide the specifications for the lavatories (P-1 and P1A). [Initial comment: Provide the specifications for the lavatories (P-1 and P1A) and the associated faucets; specifications were not found in the architectural drawings. Metering faucets are required. Reference: Section 107.2.1, IBC 2018 and Section 419.6, IPC 2018, as amended by the City of Tucson.] |
| 09/22/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed by the revised structural letter. [Initial comment: Provide structural calculations and details to show that the Type I hoods are supported from the building structure in accordance with Section 507.2.4, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2018.] 2. Comment not addressed. [Second comment: Comment not addressed. [Initial comment: Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, and C502.1, International Energy Conservation Code 2018.] 3. Comment not resolved. The performance standards are for the entire walk-in cooler as a unit, not just the condenser and the evaporator. [Second comment: Provide the walk-in cooler and freezer meet the performance standards of Tables C403.10.2.1 (2) and C403.10.2.1 (3), IECC 2018.] [Initial comment: Provide specifications for the walk-in coolers and walk-in freezers; Show that these units comply with Section C403.10.4, IECC 2018.] |