Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T19CM07097
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/17/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed by the revised structural letter. [Initial comment: Provide structural calculations and details to show that the Type I hoods are supported from the building structure in accordance with Section 507.2.4, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2018.] 2. Comment not addressed. [Second comment: Comment not addressed. [Initial comment: Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, and C502.1, International Energy Conservation Code 2018.] 3. Comment not resolved. The performance standards are for the entire walk-in cooler as a unit, not just the condenser and the evaporator. [Second comment: Provide the walk-in cooler and freezer meet the performance standards of Tables C403.10.2.1 (2) and C403.10.2.1 (3), IECC 2018.] [Initial comment: Provide specifications for the walk-in coolers and walk-in freezers; Show that these units comply with Section C403.10.4, IECC 2018.] |
| 07/17/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Second comment: Comment not resolved. Provide the specifications for the lavatories (P-1 and P1A). Include the lavatory and faucet specifications on the drawings. Provide the specifications for the lavatories (P-1 and P1A). [Initial comment: Provide the specifications for the lavatories (P-1 and P1A) and the associated faucets; specifications were not found in the architectural drawings. Metering faucets are required. Reference: Section 107.2.1, IBC 2018 and Section 419.6, IPC 2018, as amended by the City of Tucson.] 2. Comment not resolved; the appeal has not yet been approved or denied. [Second comment: Comment not resolved; the appeal has not yet been approved or denied.] [Initial comment: For public toilet facilities, the required lavatory shall be located in the same room as the water closet. Reference: Section 405.3.2, IPC 2018.] 3. Comment not addressed. [Second comment: Comment not addressed.] [Initial comment: Appliances (e.g. beverage dispensers, ice makers, etc.) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Section 608.14.1, IPC 2018 require backflow prevention. Specify the type of backflow prevention device required for each water connection. Reference: Sections 608.1 and 608.3, IPC 2018. 6. Comment not addressed. [Second comment: Comment not addressed. [Initial comment: If the discharge temperature of the dishwasher or rack washer will be greater than 140 degrees Fahrenheit, show that the temperature rating of the drainage pipe material is suitable for the highest temperature of the wastewater. Reference: Section 702.5, IPC 2018.] |
| 08/07/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/19/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: No new drawings have been submitted. Previous Building comments were not resolved. See previous review for all comments. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/31/2020 | JGARCIA1 | APPROVAL SHELF | Completed |
| 08/31/2020 | JGARCIA1 | OUT TO CUSTOMER | Completed |
| 08/31/2020 | JGARCIA1 | REJECT SHELF | Completed |