Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T19CM07097
Parcel: 124150330

Address:
941 E 19TH ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T19CM07097
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/11/2019 MASHFOR1 FIRE REVIEW Approved Fire Sprinkler & Fire Supression System for the Kitchen Hood are noted on first page of the DP and shall be provided to TFD as a deferred submittal as indicated on the plan set moving forward.
10/28/2019 PAUL CAMARENA ZONING REVIEW Reqs Change FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: T19CM07097 (Related to DP16-0196)
TI and Building Addition (1st Review)
941 E. 19th Street / I-1 Zoning

TRANSMITTAL DATE: October 28, 2019

DUE DATE: November 7, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.



01. COMMENT: Zoning has done a review of the building plans. In addition, while the building are consistent as it relates to the zoning review purview (as noted above) zoning cannot approve the building plans until the Commercial Plans reviewer(s) have approved the building plans


02. COMMENT: Zoning will review the building plans on the next submittal to assure consistency with the approved DP. If any changes are necessary to the building plans due to plan review comments that affect zoning requirements the DP will have to be revised to reflect the changes. Once the Commercial Plans reviewers approve the building plans zoning can approve the plans.


03. COMMENT: COMMENT: Clearly define the office area square footage. It appears that the office area approved on the DP is a lot smaller than what is depicted on the building plans. The DP may have to be revised prior to the approval of the building plans. The proposal depicted on the building plans as it relates to the restaurant and office areas of the existing building do not match the approved DP


04. COMMENT: COMMENT: Add the height of the proposed building on the elevation sheet.





If you have any questions about this transmittal, Contact Paul Camarena any time during the week at (520) 791-5550 or by email Paul.Camarena@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Corrected Building Plans
10/28/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide structural calculations and details to show that the Type I hoods are supported from the building structure in accordance with Section 507.2.4, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2018.
2. Verify the make-up air scheduled for hoods KH-1A and KH-2A; the manufacturer listing information shows a lower total supply airflow rate for these hoods. Reference: Section 304.1, IMC 2018.
3. Verify that the exhaust and make-up airflow rates for the building are approximately equal. Reference: Sections 501.4 and 508.1, IMC 2018.
4. Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, and C502.1, International Energy Conservation Code 2018.
5. Demonstrate energy code compliance for the revisions to the building mechanical and service water heating systems using calculations based on the current code. Reference: Sections C103.2, C303, and C502.1, International Energy Conservation Code 2018.
6. Provide specifications for the walk-in coolers and walk-in freezers; Show that these units comply with Section C403.10.4, IECC 2018.
10/28/2019 ROBERT SHERRY WATER REVIEW Completed
10/29/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide the specifications for the lavatories (P-1 and P1A) and the associated faucets; specifications were not found in the architectural drawings. Metering faucets are required. Reference: Section 107.2.1, IBC 2018 and Section 419.6, IPC 2018, as amended by the City of Tucson.
2. Provide the specifications and listing information for the rack washer, K-4. Reference: Section 107.2.1, IBC 2018.
3. For public toilet facilities, the required lavatory shall be located in the same room as the water closet. Reference: Section 405.3.2, IPC 2018.
4. Verify that the specified sensor faucet for the public lavatories has an automatic time-out so that it will dispense a maximum of 0.25 gallons per metering cycle. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
5. Appliances (e.g. beverage dispensers, ice makers, etc.) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Section 608.14.1, IPC 2018 require backflow prevention. Specify the type of backflow prevention device required for each water connection. Reference: Sections 608.1 and 608.3, IPC 2018.
6. At a minimum, coffee machines and non-carbonated beverage dispensers require the use of a backflow preventer listed to either ASSE 1022, ASSE 1024, or an air gap. Reference: Section 608.17.1.2, IPC 2018.
7. If the discharge temperature of the dishwasher or rack washer will be greater than 140 degrees Fahrenheit, show that the temperature rating of the drainage pipe material is suitable for the highest temperature of the wastewater. Reference: Section 702.5, IPC 2018.
8. Provide gas service to the fireplace located at the east end of the patio (see sheet a3.0 and detail 8/a9.3). Reference: Section 107.2.1, IBC 2018.
11/05/2019 RMCCOY1 ELECTRICAL-COMMERCIAL REVIEW Approved
11/08/2019 LOREN MAKUS ENGINEERING REVIEW Approved
11/08/2019 KROBLES1 BUILDING-COMMERCIAL REVIEW Reqs Change T19CM07097
BK Tacos Restaurant
1. Sheet a0.1; Project Data (Building Codes): Please remove the 2018 Uniform Plumbing Code designation, and revise the National Electric Code to the 2017 edition.
2. Sheet a0.1; Project Data (Occupancy): Please add to the Occupancy A-2-Assembly (restaurant).
3. Sheet a0.1; Project Data (Occupancy Calculations): The Occupancy Calculations indicate 12,053 total SF, while the Actual Building Area indicates 13,797 SF. Please indicate on this sheet where the 1744 SF difference occurs.
4. Sheet a0.1; Project Data (Restroom Calculations): The Men's Water Closets indicate 4 provided + 2 urinals. Please verify. The Family Restroom may count as a men's or a women's, but not both. Please indicate all existing restrooms in the portion of the building that indicates "No Work This Area", and include those in the total plumbing fixture counts.
5. Sheet a0.1; Project Data (Restroom Calculations): The lavatories total 7 as shown (4 in common area + 3 in individual restrooms). Please verify. The Family Restroom may count as a men's or a women's, but not both.
6. Sheet a0.2; Exiting Plan: It appears directional exit signs would be required in some locations per the IBC Section 1013 (Kitchen to Exits/Family RR to Exits/Etc.). Please review.
7. Sheet a0.2; Exiting Plan: It appears there are a few redundant exit signs indicated on the plan (northeast corner of Kitchen/Patio south exit/Etc.). Please review.
8. Sheet a0.2; Legend: A 1 Hour Rated Fire Separation (Horizontal) is indicated in the Legend. Where is that located?
9. Sheet a0.2; Exit Keynotes: Per the IBC Section 1010.1.10, panic or fire exit hardware is required in a Group A Occupancy unless Exceptions 1 or 2 are met. Please review the Exit Plan (Keynote 3 should indicate those required locations).
10. Sheet a0.2; Exit Plan: Please indicate a North Arrow on this sheet.
11. Sheet a0.3; Floor Plan Key Notes: Note 336 references the IBC Section 1108.2.8.1 for accessible dining surfaces. Please revise that reference.
12. Sheet a1.0; Site Plan Key Notes: Note 111 was not located on the plan. Please verify.
13. Sheet a3.0; Floor Plan: A Building Section cut between Grids 1 and 2 indicates 4/a6.0. Please revise that Section reference.
14. Sheet a3.0 (Floor Plan); Sheet a6.0 (East Elevation): The Plan indicates a gate south of Grid C, while the Elevation does not indicate that gate. Please coordinate.
15. Sheet a3.0; Floor Plan: A Building Section cut between Grids 4 and 5 indicates 3/a6.0. Please revise that Section reference.
16. Sheet a3.0; Floor Plan: A Building Section cut between Grids 6 and 7 indicates 2/a6.0. Please revise that Section reference.
17. Sheet a3.0; Floor Plan: Building Section cuts between Grids C and D indicate 1/a6.0 and 1.1/a6.0. Please revise those Section references.
18. Sheet a3.0; Key Notes: Note 306 references Sheet a5.1 for the Hardware Schedule. Please revise that reference.
19. Sheet a3.0; General Floor Plan Notes: Note 7 indicates to provide all required code fire rated assemblies at rated walls, shafts, and ducts. These requirements should be shown on the Architectural Drawings as needed.
20. Sheet a3.0; Floor Plan Key Notes: Please coordinate all doors indicating panic hardware on the Plan (Note 307) with the Door/Hardware Schedules on Sheet a5.2.
21. Sheet a3.0; Floor Plan Key Notes: Please revise the Detail reference in this note.
22. Sheet a3.0; Floor Plan Key Notes: Note 315 indicates Accessible Clearance Per ADA. Please provide a plan/detail (following the ICC/ANSI Section 405) on these drawings, and reference that plan/detail in the Key Notes.
23. Sheet a3.0; Floor Plan Key Notes: Note 322 references 19/a9.0. Please revise that reference.
24. Sheet a3.1; Wall Types: Wall Type N references Sheet a5.2. Please revise that reference.
25. Sheet a3.1; Wall Types: Please indicate the metal stud gauge on Wall Type D.
26. Sheet a4.1; Roof Plan (Roof Plan Keynotes): Note 421 (Condenser Equipment) is indicated on the Architectural Roof Plan, but does not show up on Sheet m1.2. Please coordinate.
27. Sheet a4.1; Roof Plan (Roof Plan Keynotes): Note 414 (Mechanical Equipment) appears different in size than the equipment indicated on Sheet m1.2. Please coordinate.
28. Sheet a5.0; Building Code Notes: Note 5 references the IBC Section 1008.1.8.7 for required exits. Please revise that reference.
29. Sheet a5.0; Building Code Notes: Note 20 references the IBC Section 106.1.1 for required information. Please revise that reference.
30. Sheet a5.2; Door and Hardware Schedules: Please verify the doors and hardware on the plans and notes match the Schedules.
31. Sheet a9.4; Detail 14: Please indicate the size and the quantity of connectors for the diagonal bracing to the partition and to the structure above.
32. Metal Building Drawings; Metal Building Structural Calculations: Per the IBC Section 107.3.4, the registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others. Please provide a notation on those drawings/calculations that indicates these documents have been reviewed by the engineer of record and found to be in general conformance to the design of the building.
33. Sheet S1.1 (Foundation Plan); Sheet S3.1 (Detail 111): The interior wall footing indicated on the Foundation Plan (along Grid C.8) does not have a footing mark. The footing reinforcement (Detail 111) indicates reinforcing per the Footing Schedule. Since this interior wall footing is different from the exterior wall footing, please add a footing mark to the interior wall footing.
34. General: Please provide the Special Inspection Certificate with Parts A and B completed. This form may be found on our website at www.tucsonaz.gov/PDSD.
35. General: Please provide written responses to all review comments.

Reviewed by Eric Newcomb
Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
04/30/2020 LBOWERS1 REJECT SHELF Completed