Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM06784
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/18/2019 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
| 09/18/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Reprint M100 so the background is visible and the new work is differentiated from the existing work to remain. 2. Provide duct sizes for new work. 3. Show venting, combustion/relief air for the furnace. |
| 09/18/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Designate branch circuits and panels for the power and lighting shown on the electrical floor plans. Also show the panel location. 2. Provide a complete panel schedule. 3. Complete compliance with the 2018 IECC for the lighting. 4. Provide a complete luminaire schedule. Ref; 2017 NEC, 2018 IBC sec 107.2.1, Tucson/Pima County Outdoor Lighting Code, City of Tucson Commercial Plan Submittal Requirements. |
| 09/18/2019 | ACONNOR1 | ENGINEERING | REVIEW | Passed | |
| 09/18/2019 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 09/18/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 09/18/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Reprint M100 so the background is visible and the new work is differentiated from the existing work to remain. 2. Provide pipe sizes . 3. Clarify the relocation of the gas piping. |
| 09/18/2019 | MROSS2 | FIRE | REVIEW | Approved | |
| 09/18/2019 | RMCCOY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |