Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Number: T19CM06691
Parcel: 133153170

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL

Permit Number - T19CM06691
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/26/2019 MASHFOR1 FIRE REVIEW Approved
10/01/2019 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T19CM06691- New Building (Commercial - Food Service/take out coffee shop)
Building Plan Review (1st Review) Dutch Bros Kiosk
6725 E. Tanque Verde Road - C-2 Zoning - Related to DP19-0199

TRANSMITTAL DATE: October 1, 2019

DUE DATE: October 15, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: Zoning has reviewed the building plans for compliance with the current unapproved version of the development package. While the building footprint is consistent with the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the building plans have been approved by the 3rd Party and PDSD Commercial Plans reviewers.

2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (The copy of the DP plans that are included in the building plan set must be a copy of the PDSD approved, stamped and signed DP or the set in the building set must be labeled as Reference Only See the PDSD Approved, Stamped and Signed DP19-0199.)

3. COMMENT: If any changes are necessary, due to the 3rd Party and PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning.

4. COMMENT: Once the plans have been reviewed and approved by the 3rd Party and PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning.

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans
10/18/2019 ROBERT SHERRY WATER REVIEW Completed
10/22/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change 1) Ensure that all roof drains scupper under pedestrian circulation paths as applicable
2) Once the development package has been approved and all outstanding commercial reviews are complete, Engineering can approve the building plans
12/19/2019 STANTEC 3RD PARTY REVIEW-COMMERCIAL AT 3RD PARTY OFFICE Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
12/19/2019 PMARTIN1 OUT TO CUSTOMER Completed