Permit Number: T19CM06346
Parcel: 132130750

Address:
3300 S PARK AV

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T19CM06346
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/18/2019 MROSS2 FIRE REVIEW Approved
09/18/2019 MESCALA1 ZONING REVIEW Passed
09/30/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change T19CM06346
T.I. for JTED Learning Center

1. Sheet AI0.0; Deferred Submittals: Please add the elevator to this list.
2. Sheet AI0.2; Code Plans (Second Floor): The Exit Access Travel Distance indicates 245'-9" (allowable is 250'-0") exiting at the west exit and the Common Path of Egress Travel along that same route indicates 48'-9" (allowable is 75'-0"). It appears the Exit Access Travel Distance is closer to 271', and the Common Path of Egress Travel is closer to 117'. Please review these distances and verify.
3. Sheet AI0.2; Code Plans (Second Floor): There is no Exit Access Travel Distance or Common Path of Egress Travel indicated on the east end of the building. Please provide these distances on this drawing.
4. Sheet AI0.2; Code Plans (First Floor): There is no Exit Access Travel Distance or Common Path of Egress Travel indicated on the west end of the building. Please provide these distances on this drawing.
5. Sheet AI1.0; Site Plan: There are many keynote reference symbols indicated on the plan that do not indicate a specific keynote. Please provide.
6. Sheet AI2.0; Keynotes: Please indicate in Note 2 to see the metal building manufacturer drawings for all metal building cross bracing locations.
7. Sheet AI2.0; Keynotes: Please indicate in Note 11 that this condition is typical unless noted otherwise.
8. Sheet AI2.0; Keynotes: Note 18 references 10/AI9.0 for pony wall supports. Please revise that reference.
9. Sheet AI2.0; Keynotes: Note 22 indicates a full height utility chase. Please verify on the plan if the Wall Type at that location should be revised to provide a fire resistance rated wall.
10. Sheets AI2.0 and AI2.1; General Floor Plan Notes: Note B references AI8.1 for storefront sizes. Please revise that reference.
11. Sheets AI2.0 and AI2.1; General Floor Plan Notes: Note C references AI2.5 and AI2.6 for the control joint layout. Please revise that reference.
12. Sheet AI2.0; Wall Types: The Wall Types and required fire resistance rating of the elevator walls (see Section 707) and the elevator machine room walls (see Section 3005) are not addressed on this sheet. Please verify.
13. Sheet AI2.1; Second Floor Plan: The IBC Section 1021 provides criteria for egress balconies. Included in these requirements are wall separation (Section 1021.2), openness (Section 1021.3), and location (Section 1021.4). Please review and address these requirements in addition to Section 1020 (Corridors).
14. Sheet AI2.1; General Floor Plan Notes: Please add a note to reference Sheet S3.0 for the mechanical platform framing and details.
15. Sheet AI2.1; General Floor Plan Notes: Please add a note to reference Sheet AI2.0 for Wall Types and Notes.
16. Sheet AI2.1; Second Floor Plan: If walls, doors, and storefronts along Grid Line L at the exterior walkway are required to be fire resistance rated, indicate those requirements on this plan. In addition, verify the walkway floor fire resistance rating requirements.
17. Sheet AI2.2; Reflected Ceiling Plan: Per the IBC Section 1013.1, provide directional exit signs on this plan as required.
18. Sheet AI3.0; Keynotes: Note 7 references Sheet A3.2. Please revise that reference.
19. Sheet AI8.0; General Door Notes: Notes C and E reference specifications. Please provide one set of the project specifications for review.
20. Sheet AI9.0; Detail 16: Please indicate the size and quantity of connectors required at the diagonal bracing. In addition, extend the detail to indicate how the diagonal brace is connected to the roof/floor structure.
21. General: Is the elevator considered to be part of an accessible means of egress? If so, the IBC Section 1009.4 requires standby power (Section 1009.4.1). If the automatic sprinkler system does not extend to the elevator, an area of refuge will be required per Sections 1009.4.2 and 1009.6. Please include verbiage on the drawings addressing these issues.
22. General: If the elevator will not be accessible, the IBC Sections 1009.7, 1009.8, 1009.9, 1009.10, and 1009.11 are applicable. Please include verbiage on the drawings addressing these issues.
23. General: Please provide written responses to all review comments.

Review by Eric Newcomb
Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov
10/08/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The riser diagram B/P2.0 shows two cases where the vented horizontal drains from a hand sink (#15) and a mop sink cabinet (#69) terminate at the vent of a floor sink (P-14). If you want to common vent these two fixtures with the floor sinks, the additional vent is not appropriate.
2. Provide a backwater valve for the building sewer downstream of the grease interceptor. Reference: Section 714.1, IPC 2018.
3. Clarify which natural gas sizing table was used for the kitchen appliance downstream of regulator R-3. The Item #2 in the boxed note on sheet P1.6 refers to Table 402.4(5), IFGC 2018 but specifies a pressure drop of only 0.5" WC. Most of the pipe appears to be sized with a 0.5" WC pressure drop but the branch pipes for the 6-Burner ranges are sized for a 3" WC pressure drop.
10/08/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Ref; Plan Sheet E2.2. Verify all receptacles in the cooking and food prep areas of the kitchen as defined in art 100 and 210.8B2, are GFI protected as specified per the 2017 NEC.
2. Ref; plan sheet E4.0 and Panel Schedules.
(a) Provide a complete fault current analysis. Indicate available fault current and ratings for the Service and downstream equipment.
(b) Indicate feeder conductor material, Copper or Aluminum or either, and insulation types. This information could not be found in the electrical notes or other plan sheets.
(c) Locate Panel 'TVSS' on the electrical floor plans. Indicate the purpose for this panel and provide a panel schedule.
(d) Include transformer '1TV' (15 KVA) in the one-line diagram feeder schedule.
(e) Some of the panel schedules are calling out Main Breakers and Main Lugs for the same panel. Please clarify.
(f) The amp ratings shown on the one-line diagram does not correlate with the panel schedules for panels, 1LD1, 1LD2, IT, 1H2, 1LV. Please clarify.
Ref; 2018 IBC sec 107.2.1, 2017 NEC. City of Tucson Commercial Plan Submittal requirements.
10/08/2019 ROBERT SHERRY WATER REVIEW Completed
10/09/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Clarify the scheduled cooling capacity for VRV heat pumps CU-1B, CU-1C, and CU-1D as compared to the cooling load calculations. Reference: Section C403.1.1, IECC 2018.
2. Provide structural calculations to verify that the floor framing is adequate to support the proposed mechanical unit EF-1 (e.g. point load as well as dead load). Provide structural details as required for any special framing revisions needed to support the unit. Reference: Section 302.1, IMC 2018.
3. Provide structural calculations and details to show that the Type I hoods are supported from the building structure in accordance with Section 507.2.4, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2018.
4. Provide a grease reservoir at the base of the vertical grease duct riser. Reference: Section 506.3.7.1, IMC 2018.
5. Show the slope of the horizontal grease duct. Reference: Section 506.3.7, IMC 2018.
6. Show the sizes and locations of the cleanouts for the grease ducts. Reference: Sections 506.3.8 and 506.3.9, IMC 2018.
10/16/2019 LOREN MAKUS ENGINEERING REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
11/18/2019 PMARTIN1 OUT TO CUSTOMER Completed