Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T19CM06331
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/08/2019 | RMCCOY1 | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Electric Plans are not Stamped by an Arizona Registrant. IBC 107.2.1. 2. Submit Outdoor Lighting Code Calculations for exterior lights , compliant with the 2012 Pima County / City of Tucson Outdoor Lighting Code . IBC 107.2.1. |
| 10/08/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. The development package is not a substitute for a complete site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018. 2. Provide a site drawing showing the location of the proposed gravity grease interceptor, the size, route, and slope of the building sewer, the location of all cleanouts in the building sewer, and the location of the connection of the building sewer to the public sewer. Reference: Section 107.2.1, IBC 2018. 3. Provide a cleanout at the junction of the building drain and the building sewer. Reference: Section 708.1.3, IPC 2018. 4. Provide a cleanout in the building sewer prior to entering the right-of-way. Reference: Pima County Standard Detail RWRD 401, 2015. 5. The gravity grease interceptor detail (1/MP1.0) appears to show a structure that will be built on site. Provide structural calculations for the interceptor and complete construction details. Reference: Section 107.2.1, IBC 2018. 6. Provide calculations showing how the water supply piping has been sized. Reference: Sections 604.1 and 604.3, IPC 2018. 7. Provide a full-open valve for the water service at the building entrance. Reference: Section 606.1(2), IPC 2018. 8. Show the location of the backwater valve. Reference: Section 714.3, IPC 2018. 9. Provide sizing calculations for the proposed gravity grease interceptor. Reference: Section 1003.3, IPC 2018, as amended by the City of Tucson. 10. Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. Reference: Section 1003.9, IPC 2018. 11. Provide roof drainage calculations and plans. Provide overflow protection for the roof. Clarify the dimensions of the primary scuppers. 12. The controlling code for gas piping is the 2018 International Fuel Gas Code. |
| 10/08/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide an Arizona Registrant's seal for sheet MP2.0. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Demonstrate energy code compliance for the building envelope and the HVAC equipment using calculations based on the current code (e.g. COMcheck). Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018. 3. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2018) is to be accomplished. Reference: Section C401.2, IECC 2018. 4. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1, IECC 2018. 5. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and automatic start-up control (i.e. the thermostat is capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy) and, if the thermostat does not require manual changeover from the heating and cooling modes, it restricts set point overlap. Reference: Section C403.4.2 through C403.4.2.3, IECC 2018. 6. Terminate condensate drains at an approved disposal location (i.e. a splash block on the roof is not an approved location). Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson. 7. Revise the Roof Top Unit Schedule using tag numbers for the units that are coordinated with the plumbing plan on sheet MP1.0. Reference: Section 107.2.1, IBC 2018. |
| 10/08/2019 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Coordinate the location of the water service lines as shown on the architectural site plan with the plumbing drawings. Reference: Section 107.2.1, IBC 2018. 2. Provide the size of the water meter for the shell building and the proposed water demand it will be serving. Reference: Section 107.2.1, IBC 2018. 3. Show the location and size of the backflow preventer associated with the water service to the building. Reference: Section 107.2.1, IBC 2018. |
| 10/09/2019 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Submit a completed Special Inspections Form . IBC 107.2.1 |
| 10/10/2019 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: Valencia Commercial Building Plans (1st Review) 3253 E VALENCIA RD T19CM06331 - I-1 Zoning Related to DP19-0184 TRANSMITTAL DATE: October 10, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. Zoning has reviewed the building plans for compliance with the approved development package. While the building plans are consistent with the approved DP as it relates to the zoning review purview of the Building footprint, Height, square footage, site conditions etc., zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans. 02. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. 03. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact Paul Camarena any time during the week at (520) 837-4082 or by email Paul.Camarena@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
| 10/10/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/10/2019 | PCAMARE1 | ENGINEERING | REVIEW | Approved | |
| 10/10/2019 | KROBLES1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/25/2019 | AMARTIN1 | OUT TO CUSTOMER | Completed |