Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T19CM06154
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/04/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide more electrical detail showing Conduit, conductor sizes and types feeding the new control building. Where the feeders originate and how they terminate at the control building. Include a grounding detail for the building. 2. It is unclear as to how or what the equipment is terminated to in the control building or control cabinet. Perhaps provide a complete line diagram showing feeders or equipment branch circuits from source terminations to loads, identify all cabinets and or panels. Ref; 2018 IBC sec 107.2.1, 2017 NEC. |
| 10/04/2019 | IMONSHI1 | ZONING | REVIEW | Reqs Change | Zoning cannot approve until archealogical review on this site has been approved. Please contact Allison Diehl at Allison.Diehl@tucsonaz.gov asking for questions and review of plans |
| 10/07/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet 6; Building Section Key Notes: Note 7 has a Detail B indicated at the end of the note. Please add to the Note that Detail B is an alternate for the steel angles lintel. 2. Sheet 6; Building Section Key Notes: The thickened slab at the edge of the pad (Note 6) indicates a Key Note 12 at that location. Only one-#4 is indicated at the top and at the bottom. Please revise. 3. Sheet 6; Building Section Key Notes: Note 13 indicates wall reinforcing shall extend 16" or 14" beyond the opening. The Right Elevation indicates 16" or 24". Please verify. 4. General: Please provide structural calculations for this project. 5. General: Please provide a Special Inspection Certificate with Parts A and B completed. 6. General: Please provide written responses to all review comments. |
| 10/07/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 10/07/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 10/07/2019 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 10/11/2019 | MASHFOR1 | FIRE | REVIEW | Approved | |
| 10/22/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/21/2019 | SBORZAK1 | REJECT SHELF | Completed |