Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM05998
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/03/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 09/05/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 09/05/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 09/05/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The basis of the structural calculations for the support of the mechanical equipment is a single unit weighing 200-pounds, located on the roof. Revise the structural calculations using the actual unit weights (302-pounds for the indoor unit and 435-pounds for the outdoor unit). 2. Provide ventilation for the Audio-visual room per Table 403.3.1.1, IMC 2018. 3. Provide an energy analysis of the installation of twelve Solatubes (e.g. COMcheck envelope alteration). Reference: Sections C503.1 and C503.3.3, IECC 2018. |
| 09/16/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Ref; Plan Sheet EP102. Verify or provide a weather proof GFI protected receptacle on the roof for AC maintenance. NEC 210.63. 2. Provide complete compliance with the 2018 IECC for the lighting. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/18/2019 | QJONES1 | APPROVAL SHELF | Completed |
| 09/18/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
| 09/18/2019 | QJONES1 | REJECT SHELF | Completed |