Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM05845
Parcel: 140260360

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T19CM05845
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/15/2019 ALEXANDRA HINES ZONING REVIEW Approved
08/15/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
08/15/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
08/15/2019 AHINES2 ENGINEERING REVIEW Passed
08/15/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A023-PH4; Plan 7: Per the 2009 ICC/ANSI A117.1 Figure 604.5.1, a vertical grab bar is required. Please indicate and dimension the grab bar on Side Elevations B and C.
2. Sheet A051-PH4; Plumbing Fixtures: The lavatories indicate 5.2875, which is rounded down to 5. This should be rounded up to 6 per the IBC Section 2902.1.1. Please revise.
3. Sheet A201-PH4; Construction Plan: Please indicate the construction of the new wall (stud size/gauge/spacing).
4. General: Please provide written responses to all review comments.
08/15/2019 ROBERT SHERRY WATER REVIEW Completed
08/15/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
08/15/2019 MARTIN BROWN FIRE REVIEW Approved
08/15/2019 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed