Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM05665
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/27/2019 | MROSS2 | FIRE | REVIEW | Approved | |
| 08/29/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide a copy of the approved shell building drawings. Done 10/01/19: Revise the hot water piping so that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. |
| 09/05/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: Iman Monshizadeh PDSD Zoning Review Section PROJECT: T19CM05565 - T.I. (Commercial - Medical Outpatient) Building Plan Review (1st Review) CMG / Related to DP19-0084, T19CM04126 1707 W St. Mary's Rd / O-3 Zoning TRANSMITTAL DATE: September 5th, 2019 DUE DATE: September 19th, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the T.I. building plans for compliance with the approved development package. While the building plans are consistent with the approved DP as it relates to the zoning review purview of the Building footprint, Height, square footage, site conditions etc., zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. 3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact Iman Monshizadeh at (520) 791-5550 or by email Iman Monshizadeh@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov |
| 09/10/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet g2.0; Floor Plan: Per the IBC Section 1017.3, the exit access travel distance shall be measured along the natural and unobstructed path of horizontal and vertical egress travel to an exit. Please revise this sheet by removing diagonal paths of egress travel. 2. Sheet g2.0; Code Analysis: The allowable SF (in 'General') indicates 173,500 SF, while the allowable SF (in 'Allowable Floor Area Increase') indicates 172,500 SF. Please coordinate. 3. Sheet g2.0; Code Analysis (General): The allowable number of stories indicates 3, while Table 504.4 indicates 4 stories for a sprinklered B Occupancy Type IIB construction. Please verify. 4. Sheet g2.0; Floor Plan: Per the IBC Section 1028.1, exits shall discharge directly to the exterior of the building. The exit off Hall A117 does not meet that requirement. In order to use that location as a building exit, a horizontal exit (IBC Section 1026) from the indicated door to an exterior door would be required. Please verify. 5. Sheet g2.0; Floor Plan: Please indicate on this plan the requirement for the separation of exit doorways (IBC Section 1007.1.1) is met. 6. Sheet g2.0; Floor Plan (Code Analysis): A note indicates the "Core/Shell has two restrooms and a high/low drinking fountain on each floor". Please indicate the location of the drinking fountain on this plan. Will this tenant be able to access that location? Please verify. 7. Sheet a1.0; Floor Plan Legend: Please add to the legend to see Sheet a9.0 for the partition types. 8. Sheet a1.0; Floor Plan: Keynote 11.1 indicates a fire extinguisher and cabinet. Please add a reference to 16/a9.0 in this Keynote. 9. Sheet a7.2; Elevation 8: Is this elevation indicated on an enlarged plan? Please verify. 10. Sheet a7.3; Enlarged Plan 1: Detail indicator 8 is not legible. Please revise. 11. Sheet a9.0; Details 12, 17, and 18: Please indicate the vertical stud and brace stud gauges. 12. Sheet a9.0; Detail 20: Please indicate the bolt size and length for the base plate. 13. General: Please provide a Special Inspection Certificate with Parts A and B completed. 14. General: Please provide written responses to all review comments. |
| 09/17/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide for a main circuit breaker for panel 'LV5'. NEC 408.36. See panel schedule. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC |
| 09/26/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
| 10/01/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | Provide a copy of the approved shell building drawings. Done |
| 10/01/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | Provide a copy of the approved shell building drawings. Done. |