Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T19CM05656
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/29/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Previous Comment 1; New Floor Plan: Per the IBC Section 420.2, walls separating dwelling units in the same building shall be constructed as fire partitions per IBC Section 708. Please indicate on Sheet A1 the common separation walls as one hour fire resistance rated. 2. Previous Comment 3; Site Plan Sheet S1: Please indicate on this sheet the building occupancy classification as R-2. 3. Previous Comment 4; Site Plan Sheet S1: Please indicate on this sheet if this building is equipped with an automatic sprinkler system as required by the IBC Section 903.2.8. This would include the new bedroom addition. A note on Sheet A1 indicates to adjust, modify, extend all sprinkler head and line work. 4. Previous Comment 5; General: A project valuation (labor + materials) for this project must be submitted during the review process. Owner did not submit the valuation in this submittal. 5. General: Include all project sheets in the next submittal. Sheet A1 indicates mechanical and electrical sheets (not included in this submittal). 6. General: Please provide written responses to all review comments. |
10/04/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Comment not addressed. No ventilation calculations are shown and nothing shows how mechanical ventilation will be provided. [Initial comment: Provide calculations to verify that adequate mechanical ventilation will be provided for the occupied spaces due to the addition of a bedroom. Reference: Section 403.3.1.1, IMC 2018.] |
10/11/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
10/11/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | T19CM05656 1050 E 8th St Building plans 1. The development package for this project has not yet been approved. DP19-0261 must be approved prior to building plan approval. Outstanding comments can be viewed online here: https://www.tucsonaz.gov/pro/pdsd/review/detail/12406132A/DP19-0261/331545/ 2. Once the DP is approved, the building plans will be reviewed for consistency. 3. Zoning will not provide approval on the building plans untial all commercial plan reivewers comments have been addressed. Elisa Hamblin, AICP elisa.hamblin@tucsonaz.gov |
10/19/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/14/2021 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | 1. A cost estimate for the proposed scope of work is required . Please upload this in the next submittal and/or send directly to me through email. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |