Permit Number: T19CM05585
Parcel: 132191160

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T19CM05585
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/23/2019 RMCCOY1 BUILDING-COMMERCIAL REVIEW Approved
11/01/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Show the installation of the hot water return piping from the restroom lavatories on the plumbing plan. [Initial comment: Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.]
2. Vents from a floor sink, a floor drain, and the trench drain are shown running horizontally below the flood rims of the fixtures on the plumbing plan. [Initial comment: Verify that all of the vents (except for vents serving interceptors located outdoors) rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2018.]
11/01/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The HVAC heating/cooling load calculations show a total building cooling load of 60,199 BTUH but the design documents show a total cooling capacity of 148,800 BTUH if the cooling capacity of the make up air unit (73,000 BTUH) is not included. How is this justified? [Initial comment: Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Sections C403.1.1 and C502.2.3, IECC 2018.]
2. The 2018 IMC is the controlling code for ventilation calculations, not the 2012 UMC as amended by the City of Houston. [Initial comment: Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2018.]
3. The hood installation drawings show the hood supported from ceiling joists with all-thread and Unistrut. Provide structural calculations to show that the building structure is adequate to support the hood. [Initial comment: Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.2.4, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2018.]

Final Status

Task End Date Reviewer's Name Type of Review Description
11/12/2019 SBORZAK1 REJECT SHELF Completed