Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE/GRADING ALL
Permit Number - T19CM05544
Review Name: RESUB - SITE/GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/29/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The lavatories in the first floor restrooms are more than 15-feet from WH-1, their hot water source, and there is no hot water recirculation system shown on the drawings. [Second comment: See Table C404.5, IECC 2018 which limits the maximum distance from a public lavatory to the hot water source to 2-feet for a ½" pipe, not 50-feet.] [Initial comment: Show how the distance from the hot water source to the hot water termination for the first floor public lavatories complies with the requirements of Section C404.5, IECC 2018.] 2. A waste stack from the second floor (near column S-4.5) is connected to the branch of the building drain that passes through the backwater valve. In addition, the riser diagram on sheet P3.2 shows the second floor horizontal drain also connected to the waste stack that drops down near column Q-2 and the second floor horizontal drain appears to flow in two directions at once. Clarify the waste piping. [Second comment: Plumbing fixtures located above the rim elevation of the next upstream manhole (2482.29') may not discharge through the backwater valve.] [Initial comment: According to the civil drawings, the FFE is 2483.00' and a backwater valve is required. Show the location of the backwater valve and verify that no fixtures located above the rim elevation of the next upstream manhole (2482.29') discharge through the backwater valve. Reference: Section 714.1, IPC 2018 as amended by the City of Tucson.] |
| 01/29/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 02/03/2020 | IMONSHI1 | ZONING | REVIEW | Approved | |
| 02/25/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 03/02/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved |