Permit Number: T19CM05433
Parcel: 10504136B

Address:
555 E RIVER RD

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T19CM05433
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/02/2019 RMCCOY1 BUILDING-COMMERCIAL REVIEW Approved
08/02/2019 RMCCOY1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
08/08/2019 MARTIN BROWN FIRE REVIEW Reqs Change Per section 1204.3.1 of the 2018 International Fire Code, a 4' perimeter is required on all sides. There is only 2' on the North side of the building.
08/15/2019 PAUL CAMARENA ZONING REVIEW Reqs Change FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: 555 E RIVER ROAD ASSOCIATES LP
Building Plan (1st Review) 555 E RIVER ROAD
T19CM05433 - Parking Solar Canopy

TRANSMITTAL DATE: August 15, 2019

DUE DATE: August 27, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


01. COMMENT: Zoning has reviewed the plan and cannot approve at this time. Please address the following comments.


02. COMMENT: Zoning cannot approve until Development Package is approved.



If you have any questions about this transmittal, Contact Paul Camarena at (520) 791-5550 or by email Paul.Camarena@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans
08/23/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Verify that the bus is marked "TAP" by the manufacturer at the point of the PV utility interconnection. Otherwise provide for a field evaluation to be performed by a qualified testing agency to re-certify the electrical equipment.
2. Per the inverter cut sheets, it appears inverter #2 (30KW) is not equipped with an integrated AC disconnect. Provide a detail with dimensions showing how the inverters are mounted. Also provide compliance with NEC 705.70 (2).
Ref; 2018 IBC sec 107.2.1, 2017 NEC.
08/23/2019 JOHN VAN WINKLE ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/28/2019 AMARTIN1 OUT TO CUSTOMER Completed