Permit Number - T19CM05235
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/24/2019 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
07/24/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The mechanical equipment schedule calls for a ductless split-system air conditioner. Where is it located? How is it receiving power? Is it AHU-1 or AHU-2? Provide heating/cooling load calculations to justify the unit. Reference: Section C403.1.1 and C502.2.3, IECC 2018 and Section 107.2.1, IBC 2018.
2. Show the size, routing, and termination of the condensate drains for RTU-1 and AHU-1 (AHU-2?). Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson.
3. Provide ventilation calculations for this suite - the submitted ventilation calculations do not apply to this suite. Reference: Section 401.2, IMC 2018.
4. Spaces in which factory-built recirculating hoods tested in accordance with UL 710B are installed are considered to be kitchens and shall be ventilated per Section 403.3.1.1, IMC 2018. The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual appliance. Reference: Section 507.1, exception 2, IMC 2018.
5. Coordinate the balancing data for RTU-1 (1450 CFM) with the stated air flow for the unit (1600 CFM). Reference: Section 107.2.1, IBC 2018.
6. Provide the specifications and balancing data for EF-1. Reference: Section 107.2.1, IBC 2018.
07/24/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Provide compliance with the 2018 IECC for the lighting.
2. Indicate whether the panel P2 is existing or new.
Ref; 2018 IBC sec 107.2.1, 2018 IECC.
07/24/2019 MARTIN BROWN FIRE REVIEW Reqs Change Occupant load on cover sheets indicate 4 occupants. Floor plan show 11 seats. Please clarify.
Fire Department approval will be contigent upon satisfying mechanical comments.
07/24/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet CVR; Use Group: Please indicate on this sheet the actual Occupancy Classification is A-2, but per the IBC Section 303.1.1, this may have a B Classification.
2. Sheet CVR; Occupant Load: Please provide an accurate occupancy load. This sheet indicates 4 occupants total, but Sheet A1.2 indicates 11 seats in the dining area, and employees should also be included in the total occupant load.
3. Sheet A1.1; Floor Plan: A note indicates to see Sheet A-2.0 for wall section details. Please revise that reference to Sheet A3.0.
4. Sheet A1.2; Furniture Plan: Per the IBC Section 1109.11, at least 5% of the seating/standing spaces (not less than 1) must be accessible. Please indicate that space on the plan (34" table top height and 30" x 48" clear floor space).
5. Sheet A3.0; Partition Type 2: Please indicate the gauge of the 3 5/8" metal studs.
6. Sheet A3.0; ADA Restroom Elevations: Please add a vertical grab bar per the 2009 ICC/ANSI A117.1 Figure 604.5.1.
7. General: Please provide written responses to all review comments.
07/24/2019 ROBERT SHERRY WATER REVIEW Completed
07/24/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The International Plumbing Code, 2018 as amended by the City of Tucson, is the controlling code for this activity, not the 2018 Idaho State Plumbing Code. Reference: Section 101.2, IPC 2018.
2. Provide complete plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2018.
3. Specify the piping materials to be employed in this activity. Reference: Section 107.2.1, IBC 2018.
4. Provide specifications for the water heater. Reference: Section 107.2.1, IBC 2018.
5. Provide a detail to show that the installation of the wall-hung water closet complies with the manufacturer's installation instructions. Reference: Section 303.2, IPC 2018.
6. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
7. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018.
8. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves. The pressure-absorbing devices shall conform to ASSE 1010; an air chamber is not acceptable. Reference: Section 604.9, IPC 2018.
9. Appliances (e.g. ice makers) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Section 608.14.1, IPC 2018 require backflow prevention. Specify the type of backflow prevention device required for each water connection. Reference: Sections 608.1 and 608.3, IPC 2018.
10. Water supply connections to coffee machines and non-carbonated beverage dispensers shall be protected with backflow preventers conforming to ASSE 1022 or ASSE 1024. Reference: Section 608.17.1.2, IPC 2018.
11. Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.1, IPC 2018.
12. Provide sizing calculations for the gravity grease interceptor. Reference: Section 1003.3, IPC 2018, as amended by the City of Tucson.
13. Clarify the hydromechanical grease interceptor that will be used - two different units are specified.
07/25/2019 SMEGGIS1 ENGINEERING REVIEW Passed