Permit Number: T19CM05174
Parcel: 117050340

Address:
316 E 6TH ST

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL

Permit Number - T19CM05174
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/22/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change 1)The development package for this project is currently under revision. Once the development package DP18-0067 has been approved, engineering can approve the building plans
2) Coordinate with the development package to ensure that all roof drains scupper underneath pedestrian circulation paths
08/23/2019 ROBERT SHERRY WATER REVIEW Completed
08/29/2019 ALEXANDRA HINES ZONING REVIEW Reqs Change RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit updated drawings along with a detailed comment response letter, which states how all zoning review comments were addressed.

I have reviewed the building plans for compliance with the issued development package (DP18-0067) and found that the building plans are acceptable as it relates to zoning requirements, which includes the building square footage, building height, building footprint, and location on the site.

1. COMMENT: Remove civil and landscape sheets. If requested, include the private utility sheet and mark "FOR REFERENCE ONLY".

2. COMMENT: Add keynote, like "under separate permit, DP19-0038", next to civil and landscape sheets in index. The sheets can be compiled together later on the job site.

Zoning will review the building plans on the next submittal to assure that any updates made to the building plans or the development package does not affect zoning requirements. Zoning cannot approve the building plans until all PDSD commercial plans reviewers have also approved the building plans.

If you have any questions about this transmittal, contact Alexandra Hines at 520-837-6975 or alexandra.hines@tucsonaz.gov.
08/29/2019 JVWINKL1 LANDFILL REVIEW Passed
08/29/2019 AHINES2 ZONING HC REVIEW Approved
09/04/2019 ALEXANDRA HINES DESIGN PROFESSIONAL REVIEW Reqs Change POSTER
FROST
MIRTO
A RC HI T E CT U R E
P LA NN I N G
P RE S E R VA T I O N

317 North Court Avenue
Tucso n, Arizona 85701
P H 5 2 0 . 8 8 2 . 6 3 1 0
F A X 5 2 0 . 8 8 2 . 0 7 2 5
www.posterfrostmirto.com

DATE: August 30, 2019

TO: IID Design Review Committee
c/o Koren Manning, Principal Planner
Planning & Development Services, City of Tucson
201 N Stone Avenue, Tucson, AZ 85701

FROM: Corky Poster, Architect/Planner (AICP)
City of Tucson On-Call Design Professional

RE: IID-15-01, HPZ-14-11
Related Activity Numbers: DP-18-0067, T18PRE0006
Union on 6th
340 East 6
th Street, Tucson, AZ
(includes 316 East 6
th Street, and 49-424 North Herbert)

OWNER(S): Tigre Properties I, LLC; Honeybadger Happenings, LLC; Four Emeralds, LLC; Darlene
Gaston; Wayne Hausknecht.

ARCHITECT: VFLA and a.23 Studios

PHASE: REVIEW OF PERMIT SET

On August 20, 2019, in the 3
rd floor large conference room of COT P & DSD, I reviewed the full
permit set of the construction documents for the above-cited project. I reviewed them for two
hours and then discussed my findings with Architect Burak Bekat on the telephone and with Koren
Manning in the room.

I reviewed the set and confirmed several key items:
A0.0: I confirmed that any substitutions must be approved by the Owner and the Architect.
A0E.1: Unit 112 is a live-work space as promised. And is differentiated by brick (as per A3E.1) The
internal patio is accessible from 6
th Street as promised. The detail at the 4
th Avenue SE complex
entry gate is well done.
A0E.4: The upper level setback form 6
th Street and 4
th Avenue was respected.
A3E.1 (and others): Sunshades over double (D) windows on all sides but north as promised.
A4E2.14: Steel tube sunshade awning detailed as promised.

In addition, I have the following questions/findings:
1. The 2
nd and 3
rd level windows facing 4
th Avenue (A3E.1) has consolidated the two separate
protrusions into a single larger one. That change is noted and accepted as equivalent.
2. The porcelain tile (non-decorative) size on the design renderings is shown as a smaller tile (4”
or 6”). On the permit set (A3E.1) those tiles are shown as 12” or 16”. Please construct the
project with the smaller porcelain tiles to give better detail at the pedestrian scale.
3. The promised mural on the final design submittal is not shown on A3W.2. Please ensure that
this mural is included in the project as promised. Please submit final mural design to COT when
complete.
4. The drawings show (A0E.3) the upper level balcony on 4
th Avenue allowing residents to come all
the way to the east parapet (approx. 4’ tall) and overlooking 4
th Avenue. I strongly suggest that
you place terrace planters in this area to keep people away from that overlooking edge.
09/04/2019 ALEXANDRA HINES DESIGN PROFESSIONAL REVIEW Reqs Change RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit updated drawings along with a detailed comment response letter, which states how all design professional review comments were addressed.
Design Professional or delegated staff will review the building plans on the next submittal to assure that any updates made to the building plans or the development package does not affect design requirements. Design Professional or delegated staff cannot approve the building plans until all PDSD commercial plans reviewers have also approved the building plans.
If you have any questions about this transmittal, contact Alexandra Hines at 520-837-6975 or alexandra.hines@tucsonaz.gov.
09/05/2019 MASHFOR1 FIRE REVIEW Approved Required Changes were added based on Martin Browns previously notes pertaining to this project concerning Fire hydrants and Fire Service expectations on DP18-0067. Please provide all deferred submittals to Tucson Fire Department for review as also indicated on this plans set for Fire Sprinklers & Alarms
12/03/2019 STANTEC 3RD PARTY REVIEW-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
12/03/2019 PMARTIN1 OUT TO CUSTOMER Completed