Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL
Permit Number - T19CM04836
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/22/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 07/24/2019 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | 1. Provide occupancy loads for all areas 2. Provide dimensions for all exit pathways 3. Provide kitchen appliance specifications 4. Need fire raated access to pump room 5. Verify electrical fixtures in pump room meet rated requirements 6. Provide generator spcifications/cut sheets 7. Show exit hardware details on exits from assembly areas |
| 08/01/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T19CM04836 - New Building (Commercial - Travelers Accommodation / Hotel) Building Plan Review (1st Review) Hampton Inn 141 S. Stone Avenue - C-3 Zoning - Related to DP19-0018, T19SA00104 and T19SA00181 TRANSMITTAL DATE: August 1, 2019 DUE DATE: August 5, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the current version of the development package DP19-0018. While the building plans are consistent with the current version of the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the 3rd Party, PDSD Commercial Plans Reviewers and the Design Professional have approved the building plans. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the approved DP. (Include a copy of the approved and PDSD stamped version of the DP with the next building submittal.) 3. COMMENT: If any changes to the building plans are necessary, due to the 3rd Party, PDSD Commercial Plan Reviewer's or the Design Professional comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning. 4. COMMENT: Once the building plans have been reviewed and approved by the 3rd Party, PDSD Commercial Plan Reviewers, Design Professional and zoning has verified consistency with the DP, the building plans can be approved by zoning. Assure that any conditions of approval of the IID are incorporated into the building plans. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building plans |
| 08/09/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | The development package must be approved first. |
| 09/10/2019 | PMARTIN1 | DESIGN PROFESSIONAL | REVIEW | Needs Review | |
| 09/10/2019 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/10/2019 | PMARTIN1 | OUT TO CUSTOMER | Completed |