Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM04766
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/12/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
07/12/2019 | RMCCOY1 | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
07/31/2019 | PCAMARE1 | ZONING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: City of Tucson TOPSC BLDG 10 Building Plans (1st Review) 4004 S Park Avenue T19CM04766 - Parking Solar Canopy TRANSMITTAL DATE: July 31, 2019 DUE DATE: August 1, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: Provide height dimension for the solar panel (from the pavement to the bottom of the purlin of the tallest end) 02. COMMENT: Clarify which direction the solar panels are facing, east or west. 03. COMMENT: Provide future and existing right away information for Park Ave. Include dimension from center line to existing and future property line, include existing and future curb location and dimension from back of curb to edge of the parking solar canopy. The minimum street building setback is 21 ft. or the height of the structure whichever is greater from the back of existing and future curb location. If you have any questions about this transmittal, Contact Paul Camarena any time during the week at (520) 791-5550 or by email Paul.Camarena@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
08/05/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/07/2019 | QJONES1 | APPROVAL SHELF | Completed |
08/07/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
08/07/2019 | QJONES1 | REJECT SHELF | Completed |