Permit Number: T19CM04191
Parcel: 12901035K

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T19CM04191
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/13/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Provide the code analysis for the minimum number of required plumbing fixtures using 2018 IBC Chapter 29 and Table 2902.1 . IBC 107.2.1.
2. Cover Sheet - Code Review - 6. Occupant Loads Restroom Area 559/100 = 3 . Is this square footage (559) already included in lower level area , provide code analysis to clarify square footage and occupancy . IBC 107.2.1.
3. Provide office square footage and include in the Code Review , revise square footage for building and occupant load . IBC 107.2.1
06/13/2019 MARTIN BROWN FIRE REVIEW Approved
06/18/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide unique page numbers for the plumbing drawings (e.g. P-1. P-2, and P-3). Reference: Section 107.2.1, IBC 2018.
2. Clarify the size of the existing water service; it is 1-1/2" on the plumbing water plan and 2" on the water riser. Reference: Section 107.2.1, IBC 2018.
3. Clarify the size of the existing building sewer; it is 6" on the plumbing waste plan and 4" on the sewer riser. Reference: Section 107.2.1, IBC 2018.
4. The proposed water heater will be connected to the existing natural gas distribution system. Provide a complete diagram of the natural gas distribution system showing the all of the loads, developed lengths, and the layout of the distribution piping. Reference: Section 402.2, IFGC 2018.
5. Provide air for combustion, ventilation and dilution of the flue gases for the proposed water heater. Reference: Section 304, IFGC 2018.
6. Specify the type of venting systems and the venting materials to be used for the proposed water heater. Reference: Section 503.1, IFGC 2018.
7. Verify the depth of the existing building sewer and provide calculations to show that the proposed foundation will not adversely affect the pipe. Reference: Sections 305.2 and 305.3, IPC 2018.
8. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1, 504, 606.1 , 607.2, and 607.3, IPC 2018
9. Verify that the specified metering faucet for the public lavatories can be set to dispense a maximum of 0.25 gallons per metering cycle. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
10. Provide tempered water for the public restroom lavatories using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2018
11. Provide shower valves that comply with the requirements of Section 412.3 and 424.5, IPC 2018
12. The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2018.
13. Verify that the distance to the hot water terminations from the hot water source complies with the requirements of Section C404.5, IECC 2018.
14. Verify the materials that have been used for the existing building sewer and fittings. Reference: Section 702, IPC 2018.
06/18/2019 ROBERT SHERRY WATER REVIEW Reqs Change 1. Show the location of the existing water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.5, IBC 2018.
2. Verify the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and provide the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018.
3. Verify the water pressure range for the site; it is not 65 PSI. Reference: Section 107.2.1, IBC 2018.
06/19/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide calculations for the building envelope to demonstrate compliance with the energy code (e.g. COMcheck). Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. As a minimum, the information shall include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2018.
2. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2018) is to be accomplished. Reference: Section C401.2, IECC 2018.
3. Show that the proposed HVAC equipment complies with the requirements of Section C403, IECC 2018 for efficiency and controls (e.g. COMcheck).
4. Provide specifications for the proposed mini-split AC unit for the office. Show how it will provide ventilation for the office. Reference: Section 107.2.1, IBC 2018.
5. Provide structural calculations and details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2018.
6. Show the size, routing, and termination of the condensate drains for the three AC units. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson.
7. Show that a separation of at least ten feet exists between air intake openings and exhaust openings. Reference: 401.4, IMC 2018.
8. Secure the refrigerant circuit access ports of the condensing units to prevent unauthorized access. Reference: Section 1101.10, IMC 2018.
07/09/2019 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T19CM04191 - New Gym Building - Multi-family Development
Building Plan Review (1st Review) - Related to DP18-0262
140 S. Tucson Boulevard - C-1/C-2 Zoning

TRANSMITTAL DATE: July 9, 2019

DUE DATE: July 10, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: Zoning has reviewed the Building plans for compliance with the unapproved version of the development package. While the building footprint and the site revisions are consistent with the unapproved version of the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc.) zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans.


2. COMMENT: Dimension the elevations or Section sheets, the height of the building from design grade to the midpoint of the roof structure. Per the DP the height proposed is 25 feet. Label the actual height as noted above.


3. COMMENT: Zoning will review the building plans on the next submittal to assure that any revisions made to the building plans do not affect zoning requirements and that all PDSD commercial plans reviewers have also approved the building plans and that the DP18-0262 has been approved.

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: as noted above
07/09/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Assign circuit numbers and panel designations for all mechanical equipment. Also specify whether using copper or aluminum feeders for all mechanical equipment.
2. Ref; Plan Sheet E-1, E-5. Clarify the circuiting for the interior and exterior Mini Splits and correlate with the panel schedule.
3. Provide for Tamper Resistant receptacles per NEC 406.12.
4. Ref; plan Sheet E-3. Indicate branch circuits and panel for the ceiling fans.
5. Provide a wiring diagram for the lighting controlled via timer.
6. The values in watts per sq/ft shown on the Comcheck for the interior lighting do not correlate with the tables C405.3.2(2) in the 2018 IECC. Please clarify.
7. Ref; Plan Sheet E-5.
(a) Provide a fault current analysis for the service and downstream equipment.
(b) Why is the fault current rating for panel 'B' greater than panel 'A' ?
(c) Provide for water, gas, bonding as well as building steel if applicable for the grounding electrode system.
(d) The calculated load in amps for panel 'B' is greater than the OCPD in panel 'A' for that panel. Please justify.
(e) What and where is the 3k generator shown on the panel A schedule, circuit 6,8?
8. Provide complete compliance with the Tucson/Pima County Outdoor Lighting code for the exterior lighting.
9. Ref; Plan Sheet E-3.
(a) Assign a branch circuit, panel, and controls for the 'D' exterior lighting.
(b) Provide luminaires rated for wet and damp locations for the lighting in the steam and sauna rooms and any other areas that may be subject to damp or wet environment. Per NEC art 410.10A.
Ref; 2018 IBC sec 107.2.1, 2017 NEC, Tucson/Pima County Outdoor Lighting Code.
07/12/2019 LOREN MAKUS ENGINEERING REVIEW Needs Review 1. DP must be approved first.
2. Clearly show location of primary roof drains to demonstrate they will not discharge over sidewalks.
07/22/2019 QJONES1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
08/26/2019 QJONES1 APPROVAL SHELF Completed
08/26/2019 QJONES1 OUT TO CUSTOMER Completed
08/26/2019 QJONES1 REJECT SHELF Completed