Permit Review Detail
Review Status: Active
Review Details: COMMERCIAL - TI
Permit Number - T19CM03761
Review Name: COMMERCIAL - TI
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/03/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet TS1 - Project Code Review - Occupant Loads : 4. Fitness Center notes an occupant load factor of 100 . IBC Table 1004.5 states the occupant load factor as 15 net . Calculate occupant loads with correct information . IBC 107.2.1, IBC Table 1004.5. 2. Sheet TS1 - Project Code Review - Occupant Loads : 1. Office and 2. Business Center notes an occupant load factor of 100 . IBC Table 1004.5 states the occupant load factor as 150 gross . Calculate occupant loads with correct information . IBC 107.2.1 , IBC Table 1004.5. 3. Sheet TS1 - Project Code Review - Occupant Loads 5. Storage 387/300 = 1 occupant . IBC 311.1.1 Accessory Storage Spaces . A room or space used for storage purposes that is accessory to another occupancy shall be classified as part of that occupancy . Calculate occupant loads with correct information .IBC 107.2.1 , IBC 311.1.1. 4. Sheet TS1 - provide code analysis for mininum number of required plumbing fixtures . IBC 2902 , IBC 107.2.1. 5. Sheet EP1.0 - Means of Egress Width Calculations ; recalculate using correct occupant loads . IBC 107.2.1. 6. Sheet EP1.0 - Means of Egress Width Calculations ; second note references IBC section 1008.1.8.3 ; 1008.1.8.3 is not in the IBC , supply correct code reference . IBC 107.2.1 7. Sheet A1.0 - 2nd Floor Plan - references Detail 2 on sheet A4.0 , but detail 2 is not on sheet A4.0 . IBC 107.2.1. 8. Sheet S1.0 - Footing (F) Schedule - notes F-5 and F-6 footings , but F-5 and F-6 are not located in the Structural Calculations . IBC 107.2.1. 9. Sheet S1.0 - Beam (B) Schedule - notes B-6 and B-7 beams , but are not located in the Structural Calculations . IBC 107.2.1. 10. Sheet S1.0 - Column (C) Schedule - notes P-1 and P-2 columns , but are not located in the Structural Calculations . IBC 107.2.1. - Respond to plan review comments in writting . - Cloud revisions on plans . |
| 06/03/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 06/10/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Verify the required minimum plumbing fixtures for the building. Reference: Section 2902.1, IBC 2018. |
| 06/10/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 06/11/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide structural calculations and details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2018. |
| 06/21/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
| 06/27/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 07/02/2019 | DAVID RIVERA | ZONING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/31/2019 | ANY | REJECT SHELF | RECEIVED |