Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM03510
Parcel: 12801044A

Address:
6295 E 22ND ST

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T19CM03510
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/01/2019 MESCALA1 ZONING REVIEW Reqs Change FROM: Martin Escalante
PDSD Zoning Review Section

PROJECT: T19CM03510 - The Human Bean - Coffee Shop
Building Plan Review (3rd Review) - Related to DP19-0110
6295 E 22nd Street - C-2 Zoning

TRANSMITTAL DATE: October 1, 2019

DUE DATE: October 22, 2019
COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
*** Note: Previous comments still applicable.

1. COMMENT: Zoning has reviewed the Building plans for compliance with the unapproved version of the development package. While the building footprint and the site revisions are consistent with the unapproved version of the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc.) zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans.


2. COMMENT: Zoning will review the building plans on the next submittal to assure that any revisions made to the building plans do not affect zoning requirements and that all PDSD commercial plans reviewers have also approved the building plans.

If you have any questions about this transmittal, Martin Escalante at (520) 837-4082 or by email Martin.Escalante@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: as noted above
10/07/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
10/14/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
10/18/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The COMcheck assembly description indicates that the roof has R-38 cavity insulation and R-38 continuous insulation. The drawings show only R-38 cavity insulation for the roof. Coordinate the COMcheck assembly description and the roof design. [Second comment: Comment not addressed.] [Initial comment: Provide calculations for the building envelope to demonstrate compliance with the energy code (e.g. COMcheck). Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2018.]
10/23/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change After outstanding review comments from mechanical have been addressed engineering can approve the building plans

Final Status

Task End Date Reviewer's Name Type of Review Description
10/23/2019 SBORZAK1 REJECT SHELF Completed