Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM03482
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/16/2019 | NICHOLAS ROSS | ZONING | REVIEW | Approved | |
05/16/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Nail polish is applied at the pedicure stations; provide local exhaust for each pedicure station. 2. The specified 5-on heat pump has a total capacity of 53.9 MBH compared to the calculated total load of 38.7 MBH. Reconcile the difference. |
05/16/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide power and controls for exhaust fan #3. Correlate with Mechanical. Ref; 2017 NEC, 2018 IBC sec 107.2.1, |
05/16/2019 | NROSS1 | ENGINEERING | REVIEW | Passed | |
05/16/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1; Partition Types: Please indicate the gauge of the metal studs at walls 4A, 4B, and 6B. 2. Sheet A2; Detail 1: A note indicates 3 5/8" metal studs. Wall 6B is 6" metal studs. Please revise the note. 3. Sheet A2; Details 1 and 2: Please indicate the bracing studs size and gauge, along with the connection size and quantity to the top of the partition and to the structure above. 4. General: Please provide written responses to all review comments. |
05/16/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
05/16/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
05/16/2019 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
05/17/2019 | JPEELDA1 | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/30/2019 | QJONES1 | APPROVAL SHELF | Completed |
05/30/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
05/30/2019 | QJONES1 | REJECT SHELF | Completed |