Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM03327
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/05/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. The plan submitted has sheets stamped by a California Registrant ; the State of Arizona requires an Arizona Registrant to design and stamp the plans .ASRS 32-125. IBC 107.2.1. 2. The Structural Calculations submitted are designed and stamped by a California Registrant ; the state of Arizona requires an Arizona Registrant to design and stamp the documents . ASRS 32-125.,IBC 107.2.1. 3. Provide two copies of the completed Special Inspections form for the inspections required on the plan.IBC 107.2.1. 4. The City of Tucson has adopted the 2018 I Codes and 2017 NEC , Sheet S001 - Special Inspections & Testing - references the 2015 IBC , please amend to the 2018 IBC . IBC 107.2.1. - Please respond to plan review comments in writting . |
06/05/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/06/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The hand sinks, B1 and B24 require a direct connection to the sanitary waste system. Reference: Section 301.3, IPC 2018. 2. Provide information to show how the proposed water heater is to be supported from the building structure (i.e. connection of the specified platform to the building structure). Reference: Section 301.2, IPC 2018. 3. Provide a watertight pan of galvanized steel, aluminum, or other approved material under the water heater with a drain to an approved location. Reference: Section 504.7, IPC 2018. |
06/06/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/06/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Keynote #9 calls for the four existing Type II hoods (for popcorn machines) to have their exhaust flow rates increased from 750 CFM to 750 CFM each to account for the addition of a fryer. Provide specifications for the proposed fryer (the fryer noted by keynote #10 is not located near the four hoods) and show that it can be accommodated by the hood. Reference: Section 507, IMC 2018. |
06/07/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Ref; Plan Sheet E4001. Provide a grounding electrode detail for the new 75KVA transformers. 2. Provide for tamper resistant receptacles as required per NEC 406.12. 3. Provide manufacturer cut sheets to verify the listings for the aisle lighting and associated transformers or drivers, and any other LV lighting as required per NEC 411.4. 4. Provide full compliance with the 2018 IECC for the new lighting. Ref; 2017 NEC, 2018 IBC sec 107.2.1. 2018 IECC. |