Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM03297
Parcel: 13313005E

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T19CM03297
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/10/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
05/15/2019 MARTIN BROWN FIRE REVIEW Approved
06/05/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Ref; Plan Sheet PV-4, PV-5.
(a) Locate the under canopy lighting on the plans and designate a branch circuit and panel. Indicate the location of the panel and provide more detail of the wiring methods utilized for the lighting.
(b) The 'Lighting Feed' detail states "QTY 1 Light Fixture" but it appears to show 4 fixtures wired in parallel. Please clarify.
2. Ref; Title Sheet P-0, and the line diagrams.
The Scope of Work indicates that the PV interconnection will be on the supply side of the existing service CT, but the line diagrams show the interconnection at a 15 amp OCPD. Please clarify.
3. Ref; Plan Sheet PV-3,
(a) Provide more detail for the 'Bonding Path Detail', and verify compliance with NEC 690.43A and B.
(b) The two smaller details under the 'Bonding Path Detail' are not legible due to small text size. Please enlarge to a minimum font of 3/32".
(c) Indicate the mounting height above grade for the inverter in the inverter detail and verify compliance with NEC 690.15A, 705.70.

Ref; 2018 IBC sec 107.2.1, 2017 NEC art 690,705.
06/06/2019 DAVID RIVERA ZONING REVIEW Reqs Change From: David Rivera
Zoning Review Section

June 6, 2019

1. Zoning cannot approve the building plans until DP19-0104 is approved.

2. Once the DP is approved and all commerial plans reviewers have approved the building plans zoning will also approve the building plans.
06/10/2019 JOHN VAN WINKLE ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
06/26/2019 AVAUGHN1 APPROVAL SHELF Completed
06/26/2019 AVAUGHN1 OUT TO CUSTOMER Completed
06/26/2019 AVAUGHN1 REJECT SHELF Completed