Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM03283
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/16/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise Sheet Index with correct information noting all sheets attached to plan set . IBC 107.2.1. 2. Submit completed Special Inspection form . IBC 107.2.1. Respond to plan review comments in writting. Cloud all corrections made on plans . |
05/31/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
06/06/2019 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: First Methodist Church - Solar Canopy Structures T19CM03283 Building Plan (1st Review) TRANSMITTAL DATE: June 6, 2019 1. COMMENT: The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. COMMENT: Until DP19-0078 is approved Zoning cannot approve the building permit. 3. COMMENT: Zoning has reviewed the building plan application for the parking lot solar canopies but cannot approve them at this time. 4. COMMENT: Based on the location of the solar canopies it appears that the building setbacks along Tyndall Avenue are not being met at 20 feet or 1.5 times the height from the property line. The following information is related to each solar canopy. Solar Canopy P1 - The building setback from the Tyndall Avenue property line to edge of the canopy is the greatest of 20 feet or 1.5 times the height (13'-8"). The required setback is 20'-6" from the property line based on the canopies' highest point of 13'-8". The proposed setback is noted as 3'-0" from PL. A DDO to modify the setback is required. Solar Canopy P2 - The building setback from the Tyndall Avenue property line to edge of the canopy is the greatest of 20 feet or 1.5 times the height (13'-8"). The required setback is 20'-6" from the property line based on the canopies' highest point of 13'-8". The proposed setback is noted as 17'-4" from PL. A DDO to modify the setback is required. Solar Canopy P3 - The building setback from the Tyndall Avenue property line to edge of the canopy is the greatest of 20 feet or 1.5 times the height (13'-8"). The required setback is 20'-6" from the property line based on the canopies' highest point of 13'-8". The proposed setback is noted as 17'-4" from PL. A DDO to modify the setback is required. Solar Canopy P4 - The building setback from the Tyndall Avenue property line to edge of the canopy is the greatest of 20 feet or 1.5 times the height (13'-8"). The required setback is 20'-6" from the property line based on the canopies' highest point of 13'-8". The proposed setback was not labeled on the plans for the P4 canopy. Until the proposed setback is labeled on the plans this comment cannot be completed with the correct information. (However a DDO to modify the setback will be required) The required building setback from the Fourth Street property line to edge of the canopy is 10 feet. The proposed setback is noted as 0" to 3'-4" from the PL. A DDO to modify the setback is required. 5. COMMENT: The property is Zoned HOCR-2 and is subject to Historic Review and approval. Within the HPZ review the building setbacks can be review and waived if there is prevailing setbacks similar to what is proposed on this project. Zoning will not be able to approve the building plans until the HPZ review application has been processed and approved. As part of the HPZ review and approval conditions of such an approval are also made and must be addressed on the building plans. List the HPZ case number, date of approval and any conditions of approval on the cover sheet. 6. COMMENT: Zoning will review the building plans on the next submittal. Be sure to include any PHZ documentation with the building gplans. Until all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/10/2019 | PMARTIN1 | OUT TO CUSTOMER | Completed |