Permit Review Detail
Review Status: Active
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM03138
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/07/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/09/2019 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide Structural Calculations for Canopy . IBC 107.2.1. 2. Provide Column Schedule on plans. IBC 107.2.1. 3. Provide Beam Schedule on plans . IBC 107.2.1. 4. Provide Purlin Schedule on plans . IBC 107.2.1. 5. Provade details for canopy/building connections?, spacing? ,etc. IBC 107.2.1 Please respond to plan review comments in writting. |
05/09/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide Structural Calculations for Canopy . IBC 107.2.1. 2. Provide Column Schedule on plans. IBC 107.2.1. 3. Provide Beam Schedule on plans . IBC 107.2.1. 4. Provide Purlin Schedule on plans . IBC 107.2.1. 5. Provade details for canopy/building connections?, spacing? ,etc. IBC 107.2.1 Please respond to plan review comments in writting. |
05/23/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Please provide complete electrical power and lighting plans, sealed by a registrant registered in the state of Arizona. See City of Tucson Electrical Commercial Plan Submittal Requirements, can be downloaded at www.tucsonaz.gov/pdsd; Include branch circuit designations, panel schedules, Indicate clearly all light fixture symbols and their associated inverter. 2. Provide a complete luminaire schedule. 3. Provide complete compliance with the Tucson/Pima County Outdoor Lighting Code. 4. Ref; 2018 IBC sec. 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements, 2012 Tucson/Pima County Outdoor Lighting Code 5. Ref; 2017 NEC, 2018 IBC 107.2.1, 2012 TUCSON/PIMA COUNTY OUTDOOR LIGHTING CODE. |
05/29/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
05/30/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T19CM03138 - Food Service Use / Chick Fil-A Building Plan Review (1st Review) - 2 Detached Canopies for Drive through area. 3605 E. Broadway Boulevard - C-2 Zoning TRANSMITTAL DATE: May 30, 2019 DUE DATE: May 31, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the Building plans for the Drive-Through Canopies but cannot approve the building plans until the 3rd Party and PDSD Commercial Plans reviewers have approved the building plans. Compliance with an approved development package is also required. 2. COMMENT: While the proposal does not appear to affect any zoning requirements as it relates to setbacks, pedestrian circulation, landscaping etc., an approved DP is required. 3. COMMENT: Zoning will review the building plans on the next submittal to assure that any revisions made to the building plans do not affect zoning requirements and verify that a DP has been submitted for review and approval. 4. COMMENT: Once the DP is approved, stamped and signed by PDSD staff and the building plans have been approved by all Commercial Plans reviewers, zoning can approve the building plans. 5. COMMENT: Contact Steve Shields for information on what he would like to see for the DP. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building plans and PDSD Approved DP |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/03/2019 | ANY | REJECT SHELF | RECEIVED |