Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T19CM02894
Parcel: 12404102B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T19CM02894
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/23/2019 ELISA HAMBLIN ZONING REVIEW Approved
04/23/2019 EHAMBLI1 ENGINEERING REVIEW Passed
04/24/2019 RMCCOY1 ELECTRICAL-COMMERCIAL REVIEW Reqs Change Provide Electrical plans for proposed tenant improvement. 2018 IBC 107.2.1.
04/24/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
04/24/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G0.02; Accessibility General Notes: Note 01 references the 2015 IBC. Please revise to the 2018 Edition.
2. Sheet G1.01; Building Code Matrix (Interior Finishes): A reference is made to interior finishes for a sprinklered condition. Please revise to non-sprinklered.
3. Sheet A10.01; Partition Details: Please indicate the stud gauge and spacing on the details.
4. Sheet A10.01; Partition Details: A note on each detail indicates to see details for bracing. Please provide those details.
5. Sheet A10.01; Partition Details: Is there a reason for Partition Type A indicating a fire resistance rating? Please verify.
6. General: Please provide written responses to all review comments.
04/24/2019 MROSS2 FIRE REVIEW Reqs Change Building is sprinklered. Please change code review analysis to indicate. Include note that sprinklers will be a deferred submittal. Check if alarm system is in building, and indicate.
04/24/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Provide plumbing design for installation of breakroom sink and dishwasher. Reference: Section 107.2.1, IBC 2018
04/24/2019 ROBERT SHERRY WATER REVIEW Completed
04/24/2019 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed