Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM02388
Parcel: 10509547A

Address:
65 W RIVER RD

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T19CM02388
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/16/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
05/21/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The Turbochef ventless ovens are listed to UL 710B (KNLZ) and use an internal recirculating catalytic converter to limit smoke, grease and odor emissions. The minimum exhaust rate of 0.70 CFM per square foot based on 100-square feet per appliance is a requirement. (For non-UL 710B listed cooking appliances that do not require a hood, refer to Section 507.3, IMC 2018.) [Initial comment: Spaces in which factory-built recirculating hoods tested in accordance with UL 710B are installed are considered to be kitchens and shall be ventilated per Section 403.3.1.1, IMC 2018. The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual appliance. Reference: Section 507.1, exception 2, IMC 2018.]
05/21/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change The glasswasher note on sheet P3.0 shifts the design responsibility onto the contractor. Determine the temperature of the effluent and specify the appropriate material for the wastewater pipe. Reference: Section 107.1, IBC 2018. [Initial comment: If the discharge temperature of the dishwasher will be greater than 140 degrees Fahrenheit, show that the temperature rating of the drainage pipe material is suitable for the highest temperature of the wastewater. Reference: Section 702.5, IPC 2018.]
05/29/2019 QJONES1 ZONING HC REVIEW Passed
05/29/2019 QJONES1 ZONING REVIEW Needs Review
05/29/2019 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
05/29/2019 QJONES1 ELECTRICAL-COMMERCIAL REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
05/29/2019 QJONES1 APPROVAL SHELF Completed
05/29/2019 QJONES1 OUT TO CUSTOMER Completed
05/29/2019 QJONES1 REJECT SHELF Completed